Project details
| Official title | Proposed Additional Construction of an Industrial Building Consisting of a Battery Pack Assembly Unit Along with the Existing Tech Centre Plant by M/s. Ashok Leyland Limited at SIPCOT Industrial Park, Pillaipakkam |
|---|---|
| Status | Environmental approval granted |
| Status since | 29 Sept 2026 |
| Application filed | 4 Jun 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Ashok Leyland Limited |
| Use | Industrial |
| Towers | 14 |
| Floors (tallest) | 3 |
| Height | 25 m |
| Parking spaces | 956 |
| Land area | 113 acres (45.7 ha) |
| Built-up area | 3,059 m² (32,927 sq ft) |
| Plot area | 4,49,472 m² (48,38,072 sq ft) |
| Project cost | ₹476.8 crore |
| Village / locality | Sr|Perumbudur Tank |
| Taluk / tehsil | Sriperumbudur |
| District | Kanchipuram |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-05167 |
In context
219 applications in Kanchipuram since January 2022 are in the same category (Buildings & townships): 151 approved, 45 filed or under review, and 23 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 113 acres, this one is larger than 88% of them.
14 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sr|Perumbudur Tank, Sriperumbudur, Kanchipuram, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Cover Glass Finishing Unit for Mobile Phone and Other Electronic… — environmental approval granted, 650 m away
- Proposed Expansion of Industrial Warehouse Building Construction by Ramanujar… — environmental approval granted, 1 km away
- Proposed to Construct the High Rise Commercial Office Building Consisting of… — environmental approval granted, 2.4 km away
- Proposed manufacturing unit of Polymeric Resins and Formulated Products — lapsed, 2.5 km away
- Proposed manufacturing unit of Polymeric Resins and Formulated Products — environmental approval granted, 2.5 km away
- Laying of Aerial Ofc Along the Road Side Which Cross the Forest Areas of… — lapsed, 2.8 km away
- Proposed Expansion of Factory Building & New Canteen Building — environmental approval granted, 3 km away
- Proposed Training Center and Hostel Building Complex — environmental approval granted, 3.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.