Quick answers
What is this project?
Proposed Expansion of Activated Carbon and Allied products from 45 to 69.2 MTPD by Kalpaka Chemicals Private Limited at 2/151, Puthiyamputhur Road, Nainarpuram post, Pudurpandiyapuram & Sillanatham Revenue village, Ottapidaram Taluk, Thoothukudi District is an approved industrial building project in Sillanattam, Ottapidaram, Thoothukkudi, Tamil Nadu. It plans 56 towers on 23 acres.
Who is building it?
The applicant is Kalpaka Chemicals Private LTD.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 15 Apr 2026), as of 27 Nov 2026.
Where is it?
In Sillanattam, Ottapidaram, Thoothukkudi, Tamil Nadu.
How big is it?
It has a stated cost of ₹10 crore and a site of 23 acres.
When was it filed?
The application was filed on 11 Jun 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 15 Apr 2026 |
| Application filed | 11 Jun 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Kalpaka Chemicals Private LTD |
| Use | Industrial |
| Towers | 56 |
| Height | 12 m |
| Parking spaces | 330 |
| Land area | 23 acres (9.3 ha) |
| Built-up area | 25,270 m² (2,72,004 sq ft) |
| Plot area | 92,850 m² (9,99,428 sq ft) |
| Project cost | ₹10 crore |
| Village / locality | Sillanattam |
| Taluk / tehsil | Ottapidaram |
| District | Thoothukkudi |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-02785 |
In context
27 applications in Thoothukkudi since January 2022 are in the same category (Buildings & townships): 12 approved, 8 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 23 acres, this one is smaller than 58% of them.
16 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sillanattam, Ottapidaram, Thoothukkudi, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Electric Vehicle Manufacturing Unit – 50000 No's/Annum with a total built-up… — environmental approval granted, 1.7 km away
- Electric Vehicle Manufacturing Unit – 50000 No's/Annum with a total built-up… — under environmental review, 1.7 km away
- Proposed Expansion of Electric Vehicle Manufacturing Unit – 2,00,000… — environmental approval granted, 1.8 km away
- Proposed Expansion of Electric Vehicle Manufacturing Unit – 2,00,000… — cleared for impact study, 1.8 km away
- B.T. Industrial Park- Tuticorin — more information requested, 1.9 km away
- Thiru. B. Murugan Rough Stone and Gravel Quarry — environmental approval granted, 2.6 km away
- Proposed Rough Stone & Gravel Quarry of Thiru. B.Ayyadurai — environmental approval granted, 2.9 km away
- Proposed Expansion of Particle Board Manufacturing Plant by Xylosuisse Private… — environmental approval granted, 2.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.