Quick answers
What is Proposed Rough Stone & Gravel Quarry of Thiru. B.Ayyadurai?
Proposed Rough Stone & Gravel Quarry of Thiru. B.Ayyadurai is an approved mining project in Sillanattam, Ottapidaram, Thoothukkudi, Tamil Nadu. The site covers 4.2 acres.
Who is building it?
The applicant is Ayyadurai B.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 26 Nov 2026), as of 27 Nov 2026.
Where is it?
In Sillanattam, Ottapidaram, Thoothukkudi, Tamil Nadu.
How big is it?
It has a stated cost of ₹65 lakh and a site of 4.2 acres.
When was it filed?
The application was filed on 19 Sept 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 26 Nov 2026 |
| Application filed | 19 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ayyadurai B |
| Land area | 4.2 acres (1.7 ha) |
| Project cost | ₹65 lakh |
| Village / locality | Sillanattam |
| Taluk / tehsil | Ottapidaram |
| District | Thoothukkudi |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-05152 |
In context
97 applications in Thoothukkudi since January 2022 are in the same category (Mining): 79 approved, 14 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4.2 acres, this one is smaller than 86% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Sillanattam, Ottapidaram, Thoothukkudi, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Thiru. B. Murugan Rough Stone and Gravel Quarry — environmental approval granted, 1.6 km away
- Thiru J Balasubramanian Rough Stone and Gravel Quarry — cleared for impact study, 2 km away
- Electric Vehicle Manufacturing Unit – 50000 No's/Annum with a total built-up… — environmental approval granted, 2.2 km away
- Electric Vehicle Manufacturing Unit – 50000 No's/Annum with a total built-up… — under environmental review, 2.2 km away
- Amendment in Environmental Clearance for Exemption from Installation of FGD as… — environmental approval granted, 2.3 km away
- Transfer of the Environmental Clearance accorded by SEIAA, Tamil Nadu by Lr.… — environmental approval granted, 2.3 km away
- Rough stone and Gravel Quarry Project Belonmgs to S. Pachaimal, Extent:… — environmental approval granted, 2.3 km away
- Proposed Expansion of Electric Vehicle Manufacturing Unit – 2,00,000… — environmental approval granted, 2.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.