Quick answers
What is this project?
Proposed Expansion of Electric Vehicle Manufacturing Unit – 2,00,000 No's/Annum of Electric Cars, 10,00,000 No's/Annum of Electric Scooters and 2000 No's/ Annum of Electric Buses with a total built-up area of 6,48,000 Sq. m under Phase-II by VinFast Auto India Private Limited is an approved industrial building project in Sillanattam, Ottapidaram, Thoothukkudi, Tamil Nadu. It plans 42 towers of up to 2 floors on 408.3 acres.
Who is building it?
The applicant is Vinfast Auto India Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 18 Aug 2026), as of 27 Nov 2026.
Where is it?
In Sillanattam, Ottapidaram, Thoothukkudi, Tamil Nadu.
How big is it?
It has a stated cost of ₹8,119.7 crore and a site of 408.3 acres.
When was it filed?
The application was filed on 9 Jun 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 18 Aug 2026 |
| Application filed | 9 Jun 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Vinfast Auto India Private Limited |
| Use | Industrial |
| Towers | 42 |
| Floors (tallest) | 2 |
| Height | 18 m |
| Parking spaces | 34,022 |
| Land area | 408.3 acres (165.3 ha) |
| Built-up area | 6,48,000 m² (69,75,007 sq ft) |
| Plot area | 11,92,410 m² (1,28,34,982 sq ft) |
| Project cost | ₹8,119.7 crore |
| Village / locality | Sillanattam |
| Taluk / tehsil | Ottapidaram |
| District | Thoothukkudi |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-04661 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 9 Jun 2026 (this page) | Environmental approval granted | 408.3 acres | ₹8,119.7 crore |
| Early planning filed 31 Jan 2026 | Cleared for impact study | 408.3 acres | ₹8,119.7 crore |
In context
27 applications in Thoothukkudi since January 2022 are in the same category (Buildings & townships): 12 approved, 8 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 408.3 acres, this one is larger than 92% of them.
14 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sillanattam, Ottapidaram, Thoothukkudi, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion of Electric Vehicle Manufacturing Unit – 2,00,000… — cleared for impact study, 0 m away
- Electric Vehicle Manufacturing Unit – 50000 No's/Annum with a total built-up… — environmental approval granted, 200 m away
- Electric Vehicle Manufacturing Unit – 50000 No's/Annum with a total built-up… — under environmental review, 200 m away
- Proposed Expansion of Particle Board Manufacturing Plant by Xylosuisse Private… — environmental approval granted, 1.2 km away
- Integrated 5GW Solar Cell Manufacturing — under environmental review, 1.7 km away
- Integrated 5GW Solar Cell Manufacturing — environmental approval granted, 1.7 km away
- Proposed Expansion of Activated Carbon and Allied products from 45 to 69.2… — environmental approval granted, 1.8 km away
- Proposed Rough Stone & Gravel Quarry of Thiru. B.Ayyadurai — environmental approval granted, 2.4 km away
More from Vinfast Auto India Private Limited in Thoothukkudi
- Electric Vehicle Manufacturing Unit – 50000 No's/Annum with a total built-up… — environmental approval granted
- Electric Vehicle Manufacturing Unit – 50000 No's/Annum with a total built-up… — under environmental review
All 4 Vinfast Auto projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.