Quick answers
What is this project?
Construction of Residential Development by M/s Pallava Estates LLP is an approved residential project in Settipunyam, Chengalpattu, Tamil Nadu. It plans 782 units in 7 towers of up to 14 floors on 6 acres.
Who is building it?
The applicant is Pallava Estate LLP.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 20 Feb 2026), as of 27 Nov 2026.
Where is it?
In Settipunyam, Chengalpattu, Tamil Nadu.
How big is it?
It has a stated cost of ₹156.5 crore and a site of 6 acres.
When was it filed?
The application was filed on 4 Aug 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 20 Feb 2026 |
| Application filed | 4 Aug 2025 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Pallava Estate LLP |
| Use | Residential |
| Units | 782 |
| Towers | 7 |
| Floors (tallest) | 14 |
| Basements | 1 |
| Height | 45 m |
| Parking spaces | 1,310 |
| Land area | 6 acres (2.4 ha) |
| Built-up area | 52,880 m² (5,69,195 sq ft) |
| Plot area | 24,228 m² (2,60,788 sq ft) |
| Project cost | ₹156.5 crore |
| Village / locality | Settipunyam |
| Taluk / tehsil | Chengalpattu |
| District | Chengalpattu |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-03862 |
In context
302 applications in Chengalpattu since January 2022 are in the same category (Buildings & townships): 206 approved, 67 filed or under review, and 29 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 6 acres, this one is smaller than 64% of them.
43 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Settipunyam, Chengalpattu, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sivanesh Bagerathi Enterprises — more information requested, 950 m away
- Sivanesh Bagerathi Enterprises — not approved, 950 m away
- Diversion of Forest Land for Underground Water Pipe Line System to Leftout Areas — lapsed, 1.2 km away
- Rediversion of forest area for Laying of Optical Fibre Cable — lapsed, 1.4 km away
- Laying of Optical Fibre Cable — lapsed, 1.4 km away
- Laying of UG OFC along the NH 45 Chennai Highways road side across Paranur RF — lapsed, 1.7 km away
- Proposed Expansion and Construction of Multi – storied Residential Group… — under environmental review, 1.7 km away
- Proposed Expansion and Construction of Multi – storied Residential Group… — cleared for impact study, 1.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.