Project details
| Official title | Proposed Construction of Industrial Building (Light and Heavy Engineering/ Manufacturing/Assembling Park/ Industrial Storage) |
|---|---|
| Status | Environmental approval granted |
| Status since | 12 Nov 2026 |
| Application filed | 16 Jun 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Miya Infrastructure Private Limited |
| Use | Industrial |
| Towers | 4 |
| Floors (tallest) | 3 |
| Height | 16 m |
| Land area | 27.1 acres (11 ha) |
| Built-up area | 65,485 m² (7,04,874 sq ft) |
| Plot area | 1,09,627 m² (11,80,014 sq ft) |
| Project cost | ₹85 lakh |
| Village / locality | Kilay |
| Taluk / tehsil | Sriperumbudur |
| District | Kanchipuram |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-04379 |
In context
219 applications in Kanchipuram since January 2022 are in the same category (Buildings & townships): 151 approved, 45 filed or under review, and 23 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 27.1 acres, this one is larger than 58% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kilay, Sriperumbudur, Kanchipuram, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Building project by M/s. One Vibrant Ware House Private Limited — lapsed, 3 km away
- "Testing Tower & Factory building" for M/s. Johnson Lifts Pvt ltd — environmental approval granted, 3.2 km away
- Industrial Building by M/s Headway Logistix Induspark Private Limited and M/s… — environmental approval granted, 3.7 km away
- Additional buildings at Delphi TVS Technologies Limited, Mannur — under environmental review, 3.8 km away
- Laying of Ofc Along Road Side From Thandalam to Arakkonam Main Road Between… — lapsed, 4.7 km away
- R. Suriyakanth Rough stone and Gravel Quarry Extent: 2.17.5 S.F.Nos. 21/1, 2,… — environmental approval granted, 5 km away
- B.Gopinathan, Mambakkam Rough Stone and Gravel Quarry Project over an Extent… — environmental approval granted, 5.1 km away
- "Kochar Industrial Park" — returned to applicant, 5.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.