Project details
| Status | Lapsed |
|---|---|
| Status since | 20 Mar 2026 |
| Application filed | 25 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | One Vibrant Warehouse Private Limited |
| Land area | 16.8 acres (6.8 ha) |
| Project cost | ₹100 crore |
| Village / locality | Vadamangalam |
| Taluk / tehsil | Sriperumbudur |
| District | Kanchipuram |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-02851 |
In context
219 applications in Kanchipuram since January 2022 are in the same category (Buildings & townships): 151 approved, 45 filed or under review, and 23 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 16.8 acres, this one is smaller than 52% of them.
16 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Vadamangalam, Sriperumbudur, Kanchipuram, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- R. Suriyakanth Rough stone and Gravel Quarry Extent: 2.17.5 S.F.Nos. 21/1, 2,… — environmental approval granted, 1.9 km away
- B.Gopinathan, Mambakkam Rough Stone and Gravel Quarry Project over an Extent… — environmental approval granted, 2.1 km away
- Industrial Building by M/s Headway Logistix Induspark Private Limited and M/s… — environmental approval granted, 2.2 km away
- Industrial Building (Light and Heavy Engineering/ Manufacturing/Assembling… — environmental approval granted, 3 km away
- Proposed Expansion of Synthetic Organic Chemicals Manufacturing Plant and… — under environmental review, 3.5 km away
- Industrial Building at SIPCOT Industrial Park Mambakkam (Sriperumbudur – Phase… — environmental approval granted, 3.7 km away
- Industrial Building at SIPCOT Industrial Park Mambakkam (Sriperumbudur – Phase… — environmental approval granted, 3.7 km away
- Proposed Training Center and Hostel Building Complex — environmental approval granted, 4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.