Project details
| Official title | Construction of Industrial Building by M/s Headway Logistix Induspark Private Limited and M/s Orbitex Induspark Private Limited |
|---|---|
| Status | Environmental approval granted |
| Status since | 9 Oct 2026 |
| Application filed | 29 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Headway Logistix Induspark Private Limited |
| Use | Industrial |
| Towers | 5 |
| Floors (tallest) | 1 |
| Height | 17 m |
| Land area | 34.6 acres (14 ha) |
| Built-up area | 92,194 m² (9,92,367 sq ft) |
| Plot area | 1,39,916 m² (15,06,042 sq ft) |
| Project cost | ₹200.1 crore |
| Village / locality | Sr|Perumbudur Tank |
| Taluk / tehsil | Sriperumbudur |
| District | Kanchipuram |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-04664 |
In context
219 applications in Kanchipuram since January 2022 are in the same category (Buildings & townships): 151 approved, 45 filed or under review, and 23 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 34.6 acres, this one is larger than 66% of them.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sr|Perumbudur Tank, Sriperumbudur, Kanchipuram, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Building project by M/s. One Vibrant Ware House Private Limited — lapsed, 2.2 km away
- Proposed Training Center and Hostel Building Complex — environmental approval granted, 2.2 km away
- B.Gopinathan, Mambakkam Rough Stone and Gravel Quarry Project over an Extent… — environmental approval granted, 2.6 km away
- R. Suriyakanth Rough stone and Gravel Quarry Extent: 2.17.5 S.F.Nos. 21/1, 2,… — environmental approval granted, 2.8 km away
- Proposed Expansion of Synthetic Organic Chemicals Manufacturing Plant and… — under environmental review, 2.8 km away
- Industrial Building (Light and Heavy Engineering/ Manufacturing/Assembling… — environmental approval granted, 3.7 km away
- Proposed Amendment in Existing EC received for Expansion of Existing Paints… — environmental approval granted, 4 km away
- Industrial Building at SIPCOT Industrial Park Mambakkam (Sriperumbudur – Phase… — environmental approval granted, 4.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.