What is this project?
Amendment in Environmental Clearance for Exemption from Installation of FGD as per MoEF&CC Notification dated 11.07.2025 for -2 X 150 MW Coal Based Power Plant Installed within EC Validity period At Swaminatham & Ottapidaram Villages, Ottapidaram Taluk, Dist. - Thoothukudi, Tamil Nadu is an approved power project in Ottappidaram, Ottapidaram, Thoothukkudi, Tamil Nadu. The site covers 225 acres.
Who is building it?
The applicant is Orissa Alloy Steel PVT. LTD..
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 7 Jul 2026), as of 27 Nov 2026.
Where is it?
In Ottappidaram, Ottapidaram, Thoothukkudi, Tamil Nadu.
How big is it?
It has a stated cost of ₹1,173.6 crore and a site of 225 acres.
When was it filed?
The application was filed on 14 Jan 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 7 Jul 2026 |
| Application filed | 14 Jan 2026 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Power |
| Applicant | Orissa Alloy Steel PVT. LTD. |
| Land area | 225 acres (91.1 ha) |
| Project cost | ₹1,173.6 crore |
| Village / locality | Ottappidaram |
| Taluk / tehsil | Ottapidaram |
| District | Thoothukkudi |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-05419 |
In context
15 applications in Thoothukkudi since January 2022 are in the same category (Power): 9 approved, 3 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 225 acres, this one is smaller than 92% of them.
15 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ottappidaram, Ottapidaram, Thoothukkudi, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Transfer of the Environmental Clearance accorded by SEIAA, Tamil Nadu by Lr.… — environmental approval granted, 0 m away
- Rough stone and Gravel Quarry Project Belonmgs to S. Pachaimal, Extent:… — environmental approval granted, 2 km away
- Thiru J Balasubramanian Rough Stone and Gravel Quarry — cleared for impact study, 2.2 km away
- Rough Stone and Gravel Quarry of Thiru.S.Pandi — more information requested, 2.3 km away
- Proposed Rough Stone & Gravel Quarry of Thiru. B.Ayyadurai — environmental approval granted, 2.3 km away
- Thiru. B. Murugan Rough Stone and Gravel Quarry — environmental approval granted, 2.7 km away
- Rough Stone and Gravel Quarry Belongs to P. Dhanadurai Singh, Extent:… — environmental approval granted, 3.2 km away
- Proposed Expansion of Particle Board Manufacturing Plant by Xylosuisse Private… — environmental approval granted, 4.5 km away
More from Orissa Alloy Steel PVT. LTD. in Thoothukkudi
- Transfer of the Environmental Clearance accorded by SEIAA, Tamil Nadu by Lr.… — environmental approval granted
All 12 Orissa Alloy Steel projects across India
About this information