Quick answers
What is this project?
Improvements of Water Supply System to Paramathi Town Panchayat is a lapsed water and irrigation project in Pottanur, Paramathi-Velur, Namakkal, Tamil Nadu. The site covers 0.2 acres.
Who is building it?
The applicant is B Rajasekaran.
Has it been approved?
No. The application was lapsed on 30 Oct 2025, so it is no longer under consideration.
Where is it?
In Pottanur, Paramathi-Velur, Namakkal, Tamil Nadu.
How big is it?
It has a stated cost of ₹11.4 crore; a site of 0.2 acres and 400 m² of forest land.
When was it filed?
The application was filed on 15 Sept 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 30 Oct 2025 |
| Application filed | 15 Sept 2025 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Water & irrigation |
| Applicant | B Rajasekaran |
| Land area | 700 m² |
| Forest land | 400 m² |
| Project cost | ₹11.4 crore |
| Village / locality | Pottanur |
| Taluk / tehsil | Paramathi-Velur |
| District | Namakkal |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-05760 |
In context
6 applications in Namakkal since January 2022 are in the same category (Water & irrigation): 0 approved, 2 filed or under review, and 4 withdrawn, lapsed or rejected.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pottanur, Paramathi-Velur, Namakkal, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- IMPROVEMENT OF WATER SUPPLY SCHEME IN S.F.No. 147/3A, DEVARAYASAMUDHARAM,… — more information requested, 0 m away
- Barrage across river Cauvery — lapsed, 100 m away
- Barrage Across the River Cauvery — lapsed, 500 m away
- Barrage Across the River Cauvery — more information requested, 500 m away
- Barrage Across the River Cauvery by Nabard — lapsed, 1.3 km away
- Existing TMT bars manufacturing unit (TMT Bars - 3800 T/M, MS Rods – 100 T/M &… — returned to applicant, 5.6 km away
- Existing TMT bars manufacturing unit (TMT Bars - 3800 T/M, MS Rods – 100 T/M &… — cleared for impact study, 5.6 km away
- Proposed Manickanatham Multi Coloured Granite Quarry Over an Extent of… — environmental approval granted, 6.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.