Quick answers
What is Barrage Across the River Cauvery?
Barrage Across the River Cauvery is a lapsed water and irrigation project in Devarayasamuthiram, Paramathi-Velur, Namakkal, Tamil Nadu. The site covers 88.4 acres.
Who is building it?
The applicant is Nallusamy Sara.
Has it been approved?
No. The application was lapsed on 11 Dec 2025, so it is no longer under consideration.
Where is it?
In Devarayasamuthiram, Paramathi-Velur, Namakkal, Tamil Nadu.
How big is it?
It has a stated cost of ₹406.5 crore; a site of 88.4 acres and 88.4 acres (35.8 ha) of forest land.
When was it filed?
The application was filed on 29 Oct 2025.
Project details
| Official title | Construction of a Barrage Across the River Cauvery in Nanjai Pugalur Village in Pugalur Taluk (Erstwhile Manmangalam Taluk) in Karur District |
|---|---|
| Status | Lapsed |
| Status since | 11 Dec 2025 |
| Application filed | 29 Oct 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Nallusamy Sara |
| Land area | 88.4 acres (35.8 ha) |
| Forest land | 88.4 acres (35.8 ha) |
| Project cost | ₹406.5 crore |
| Village / locality | Devarayasamuthiram |
| Taluk / tehsil | Paramathi-Velur |
| District | Namakkal |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-06188 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 29 Oct 2025 (this page) | Lapsed | 88.4 acres | ₹406.5 crore |
| New project filed 16 Mar 2023 | Lapsed | 16.8 acres | ₹406.5 crore |
In context
6 applications in Namakkal since January 2022 are in the same category (Water & irrigation): 0 approved, 2 filed or under review, and 4 withdrawn, lapsed or rejected.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Devarayasamuthiram, Paramathi-Velur, Namakkal, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Barrage Across the River Cauvery — more information requested, 0 m away
- Barrage across river Cauvery — lapsed, 450 m away
- Improvements of Water Supply System to Paramathi Town Panchayat — lapsed, 500 m away
- IMPROVEMENT OF WATER SUPPLY SCHEME IN S.F.No. 147/3A, DEVARAYASAMUDHARAM,… — more information requested, 500 m away
- Barrage Across the River Cauvery by Nabard — lapsed, 1.4 km away
- Existing TMT bars manufacturing unit (TMT Bars - 3800 T/M, MS Rods – 100 T/M &… — returned to applicant, 6 km away
- Existing TMT bars manufacturing unit (TMT Bars - 3800 T/M, MS Rods – 100 T/M &… — cleared for impact study, 6 km away
- Proposed Manickanatham Multi Coloured Granite Quarry Over an Extent of… — environmental approval granted, 6.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.