Quick answers
What is this project?
IMPROVEMENT OF WATER SUPPLY SCHEME IN S.F.No. 147/3A, DEVARAYASAMUDHARAM, POTHANUR, PARAMATHI TALUK, NAMAKKAL DISTRICT is a proposed water and irrigation project in Pottanur, Paramathi-Velur, Namakkal, Tamil Nadu. The site covers 0.2 acres.
Who is building it?
The applicant is Paramathy Town Panchayat.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Pottanur, Paramathi-Velur, Namakkal, Tamil Nadu.
How big is it?
It has a stated cost of ₹13 lakh; a site of 0.2 acres and 700 m² of forest land.
When was it filed?
The application was filed on 4 Mar 2026.
Project details
| Status | More information requested |
|---|---|
| Status since | 25 Sept 2026 |
| Application filed | 4 Mar 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Paramathy Town Panchayat |
| Land area | 700 m² |
| Forest land | 700 m² |
| Project cost | ₹13 lakh |
| Village / locality | Pottanur |
| Taluk / tehsil | Paramathi-Velur |
| District | Namakkal |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-05960 |
In context
6 applications in Namakkal since January 2022 are in the same category (Water & irrigation): 0 approved, 2 filed or under review, and 4 withdrawn, lapsed or rejected.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pottanur, Paramathi-Velur, Namakkal, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Improvements of Water Supply System to Paramathi Town Panchayat — lapsed, 0 m away
- Barrage across river Cauvery — lapsed, 100 m away
- Barrage Across the River Cauvery — lapsed, 500 m away
- Barrage Across the River Cauvery — more information requested, 500 m away
- Barrage Across the River Cauvery by Nabard — lapsed, 1.3 km away
- Existing TMT bars manufacturing unit (TMT Bars - 3800 T/M, MS Rods – 100 T/M &… — returned to applicant, 5.6 km away
- Existing TMT bars manufacturing unit (TMT Bars - 3800 T/M, MS Rods – 100 T/M &… — cleared for impact study, 5.6 km away
- Proposed Manickanatham Multi Coloured Granite Quarry Over an Extent of… — environmental approval granted, 6.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.