Quick answers
What is this project?
TNPDCL-RDSS-New 11kV Adari Feeder Pole and Line Erection work is a lapsed power project in Kattumavilur, Veppur, Cuddalore, Tamil Nadu. The site covers 47.5 acres.
Who is building it?
The applicant is Umavathi R.
Has it been approved?
No. The application was lapsed on 12 Sept 2025, so it is no longer under consideration.
Where is it?
In Kattumavilur, Veppur, Cuddalore, Tamil Nadu.
How big is it?
It has a stated cost of ₹2.1 crore; a site of 47.5 acres and 9.9 acres (4 ha) of forest land.
When was it filed?
The application was filed on 7 Aug 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 12 Sept 2025 |
| Application filed | 7 Aug 2025 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Power |
| Applicant | Umavathi R |
| Land area | 47.5 acres (19.2 ha) |
| Forest land | 9.9 acres (4 ha) |
| Project cost | ₹2.1 crore |
| Village / locality | Kattumavilur |
| Taluk / tehsil | Veppur |
| District | Cuddalore |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-05908 |
In context
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kattumavilur, Veppur, Cuddalore, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Laying of water pipiline under providing water supply to SIPCOT Industrial… — lapsed, 200 m away
- Pasaar Village Rough Stone and Gravel Mining Project — environmental approval granted, 7.5 km away
- Laying of Water Pipiline Under Providing Water Supply to Sipcot Industrial… — lapsed, 15.6 km away
- Laying of Aerial OFC along the Reserve Forests of Cuddalore District — lapsed, 26.9 km away
- Laying of Aerial OFC along the Reserve Forests of Cuddalore District — lapsed, 26.9 km away
- Application for Change of Name in Environmental Clearance — more information requested, 27.3 km away
- Application for No Increase in Pollution Load — initial checks, 27.3 km away
- Application for No Increase in Pollution Load — initial checks, 27.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.