What is Developing? Open the mapMap

Cleared for impact studyMining · South Tripura, Tripura

Field Development for setting up of Surface Facilities, Group Gathering Station (GGS), Development Drilling and Interconnecting pipeline between wells for Kathalchari Field Development, Block AA‐ONN‐2002/1 (Tripura) by JOGPL Private Limited

Field Development for setting up of Surface Facilities, Group Gathering Station (GGS), Development Drilling and Interconnecting pipeline between wells for Kathalchari Field Development, Block AA‐ONN‐2002/1 (Tripura) by JOGPL Private Limited is a proposed mining project in Bagmara, Sabroom, South Tripura, Tripura. The site covers 61,779.6 acres. Its stated project cost is ₹272 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 30 May 2024).

See it on the live map All projects in South Tripura

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Field Development for setting up of Surface Facilities, Group Gathering Station (GGS), Development Drilling and Interconnecting pipeline between wells for Kathalchari Field Development, Block AA‐ONN‐2002/1 (Tripura) by JOGPL Private Limited is a proposed mining project in Bagmara, Sabroom, South Tripura, Tripura. The site covers 61,779.6 acres.

Who is building it?

The applicant is Jubilant Oil and Gas PVT LTD.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 30 May 2024), as of 27 Nov 2026.

Where is it?

In Bagmara, Sabroom, South Tripura, Tripura.

How big is it?

It has a stated cost of ₹272 crore and a site of 61,779.6 acres.

When was it filed?

The application was filed on 29 Mar 2024.

Project details

StatusCleared for impact study
Status since30 May 2024
Application filed29 Mar 2024
Approval soughtEnvironmental approval
Application typeOwnership transfer
SectorMining
ApplicantJubilant Oil and Gas PVT LTD
Land area61,779.6 acres (25,001.4 ha)
Project cost₹272 crore
Village / localityBagmara
Taluk / tehsilSabroom
DistrictSouth Tripura
StateTripura
Location fromSite boundary on record
Our referenceWID-TR-00073

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Ownership transfer filed 29 Mar 2024 (this page)Cleared for impact study61,779.6 acres₹272 crore
Early planning filed 3 Nov 2022Cleared for impact study61,779.6 acres₹272 crore

In context

26 applications in South Tripura since January 2022 are in the same category (Mining): 6 approved, 17 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 61,779.6 acres, this one is larger than 96% of them.

No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.

Where it is

Bagmara, Sabroom, South Tripura, Tripura. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Jubilant Oil and Gas PVT LTD in South Tripura

4 Jubilant Oil and Gas projects in South Tripura
All 5 Jubilant Oil and Gas projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.