What is Developing? Open the mapMap

Cleared for impact studyIndustry · South Tripura, Tripura

Field Development for setting up of Surface Facilities, Group Gathering Station (GGS), Development Drilling and Interconnecting pipeline between wells for Kathalchari Field Development, Block AA‐ONN‐2002/1 (Tripura) by JOGPL Private Limited

Field Development for setting up of Surface Facilities, Group Gathering Station (GGS), Development Drilling and Interconnecting pipeline between wells for Kathalchari Field Development, Block AA‐ONN‐2002/1 (Tripura) by JOGPL Private Limited is a proposed industrial project in Bagmara, Sabroom, South Tripura, Tripura. The site covers 61,779.6 acres. Its stated project cost is ₹272 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 3 Nov 2022).

See it on the live map All projects in South Tripura

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Field Development for setting up of Surface Facilities, Group Gathering Station (GGS), Development Drilling and Interconnecting pipeline between wells for Kathalchari Field Development, Block AA‐ONN‐2002/1 (Tripura) by JOGPL Private Limited is a proposed industrial project in Bagmara, Sabroom, South Tripura, Tripura. The site covers 61,779.6 acres.

Who is building it?

The applicant is Jubilant Oil and Gas PVT LTD.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 3 Nov 2022), as of 27 Nov 2026.

Where is it?

In Bagmara, Sabroom, South Tripura, Tripura.

How big is it?

It has a stated cost of ₹272 crore and a site of 61,779.6 acres.

When was it filed?

The application was filed on 3 Nov 2022.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Field Development for setting up of Surface Facilities, Group Gathering Station (GGS),…

Project details

StatusCleared for impact study
Status since3 Nov 2022
Application filed3 Nov 2022
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantJubilant Oil and Gas PVT LTD
Land area61,779.6 acres (25,001.4 ha)
Project cost₹272 crore
Village / localityBagmara
Taluk / tehsilSabroom
DistrictSouth Tripura
StateTripura
Location fromSite boundary on record
Our referenceWID-TR-00013

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Ownership transfer filed 29 Mar 2024Cleared for impact study61,779.6 acres₹272 crore
Early planning filed 3 Nov 2022 (this page)Cleared for impact study61,779.6 acres₹272 crore

In context

1 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Bagmara, Sabroom, South Tripura, Tripura. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Jubilant Oil and Gas PVT LTD in South Tripura

4 Jubilant Oil and Gas projects in South Tripura
All 5 Jubilant Oil and Gas projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.