Quick answers
What is this project?
Field Development for setting up of Surface Facilities, Group Gathering Station (GGS), Development Drilling and Interconnecting pipeline between wells for Kathalchari Field Development, Block AA‐ONN‐2002/1 (Tripura) by JOGPL Private Limited is a proposed industrial project in Bagmara, Sabroom, South Tripura, Tripura. The site covers 61,779.6 acres.
Who is building it?
The applicant is Jubilant Oil and Gas PVT LTD.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 3 Nov 2022), as of 27 Nov 2026.
Where is it?
In Bagmara, Sabroom, South Tripura, Tripura.
How big is it?
It has a stated cost of ₹272 crore and a site of 61,779.6 acres.
When was it filed?
The application was filed on 3 Nov 2022.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Field Development for setting up of Surface Facilities, Group Gathering Station (GGS),…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 3 Nov 2022 |
| Application filed | 3 Nov 2022 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Jubilant Oil and Gas PVT LTD |
| Land area | 61,779.6 acres (25,001.4 ha) |
| Project cost | ₹272 crore |
| Village / locality | Bagmara |
| Taluk / tehsil | Sabroom |
| District | South Tripura |
| State | Tripura |
| Location from | Site boundary on record |
| Our reference | WID-TR-00013 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Ownership transfer filed 29 Mar 2024 | Cleared for impact study | 61,779.6 acres | ₹272 crore |
| Early planning filed 3 Nov 2022 (this page) | Cleared for impact study | 61,779.6 acres | ₹272 crore |
In context
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bagmara, Sabroom, South Tripura, Tripura. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Field Development for setting up of Surface Facilities, Group Gathering… — cleared for impact study, 0 m away
- Mining project by M/S Royal Industry, (Stone Crushing) — initial checks, 4.5 km away
- Forest Diversion Proposal for oil & gas well Drilling at Loc. OSTA located… — lapsed, 5.1 km away
- Diversion of 6.755 Ha Forest Land in the Approach Road for Construction of Oil… — forest land use approved, 5.1 km away
- Rediversion of the OIL Plot in Tulamura — more information requested, 5.6 km away
- Forest Diversion Proposal for laying underground oil & gas pipeline by Oil… — forest land use approved, 5.6 km away
- "diversion of Forest Land for the Constriction of Road From Kowaifung… — more information requested, 6.7 km away
- Diversion of Forest Land for the Upgradation of the Santirbazar to Karbook… — under forest review, 7.5 km away
More from Jubilant Oil and Gas PVT LTD in South Tripura
- Tripura Oil and Gas Exploration Block AA-ONN-2002/1 NELP-IV (Jubilant Oil &… — in-principle approval, conditions pending
- Tripura Oil & Gas Exploration Block Aa Onn 2002 1 Nelp IV Proposed for… — more information requested
4 Jubilant Oil and Gas projects in South Tripura
All 5 Jubilant Oil and Gas projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.