Quick answers
What is Rediversion of the OIL Plot in Tulamura?
Rediversion of the OIL Plot in Tulamura is a proposed project in Baramura Debtamura Reserved Fo, Sabroom, South Tripura, Tripura. The site covers 0.3 acres.
Who is building it?
The applicant is Indradhanush Gas Grid Limited.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Baramura Debtamura Reserved Fo, Sabroom, South Tripura, Tripura.
How big is it?
It has a stated cost of ₹4 crore; a site of 0.3 acres and 1,050 m² of forest land.
When was it filed?
The application was filed on 6 Jan 2026.
Project details
| Status | More information requested |
|---|---|
| Status since | 1 Oct 2026 |
| Application filed | 6 Jan 2026 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Other |
| Applicant | Indradhanush Gas Grid Limited |
| Land area | 1,100 m² |
| Forest land | 1,050 m² |
| Project cost | ₹4 crore |
| Village / locality | Baramura Debtamura Reserved Fo |
| Taluk / tehsil | Sabroom |
| District | South Tripura |
| State | Tripura |
| Location from | Site boundary on record |
| Our reference | WID-TR-00193 |
In context
6 applications in South Tripura since January 2022 are in the same category (Other): 2 approved, 4 filed or under review, and 0 withdrawn, lapsed or rejected.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Baramura Debtamura Reserved Fo, Sabroom, South Tripura, Tripura. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Forest Diversion Proposal for laying underground oil & gas pipeline by Oil… — forest land use approved, 100 m away
- Onshore Oil and Gas Exploration, Development Drilling and Production of… — environmental approval granted, 3.6 km away
- Mining project by M/S Royal Industry, (Stone Crushing) — initial checks, 4.8 km away
- Field Development for setting up of Surface Facilities, Group Gathering… — cleared for impact study, 5.6 km away
- Field Development for setting up of Surface Facilities, Group Gathering… — cleared for impact study, 5.6 km away
- Re-diversion of 2.82 Ha of Forest Land for Drilling of Additional Exploratory… — more information requested, 10 km away
- Drilling of Exploratory location TMAH- Cluster — environmental approval granted, 10 km away
- "diversion of Forest Land for the Constriction of Road From Kowaifung… — more information requested, 10.4 km away
All 39 Indradhanush Gas Grid projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.