Quick answers
What is this project?
Environmental Clearance for Expansion of Existing Wellness Centre (Under Violation) by M/S Punarnava Yog Foundation is an approved building project in Bhitarli, Dehradun, Uttarakhand. The site covers 7.9 acres.
Who is building it?
The applicant is Punarnava Yog Foundation.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 19 Sept 2023), as of 27 Nov 2026.
Where is it?
In Bhitarli, Dehradun, Uttarakhand.
How big is it?
It has a stated cost of ₹15.5 crore and a site of 7.9 acres.
When was it filed?
The application was filed on 19 Sept 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 19 Sept 2023 |
| Application filed | 19 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Punarnava Yog Foundation |
| Land area | 7.9 acres (3.2 ha) |
| Project cost | ₹15.5 crore |
| Village / locality | Bhitarli |
| Taluk / tehsil | Dehradun |
| District | Dehradun |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00196 |
In context
165 applications in Dehradun since January 2022 are in the same category (Buildings & townships): 107 approved, 43 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 7.9 acres, this one is larger than 83% of them.
25 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhitarli, Dehradun, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bharatnet Project (Bhitarli Gram Panchayat) — lapsed, 500 m away
- Bharatnet Project (Bhitarli Gram Panchayat) — more information requested, 500 m away
- Under the State Plan, Reconstruction of the Road Towards Nature School — forest land use approved, 1.7 km away
- Transfer of 3.3075 Hectares of Forest Land to the Public Works Department for… — lapsed, 2.2 km away
- USOF 4G Saturation Project-4G Mobile Tower Installation — forest land use approved, 2.2 km away
- New 4g Mobile Tower Installation at Rikholi Comp-No-6 by Bharat Sanchar Nigam… — lapsed, 2.2 km away
- Transfer of 0.4032 Hectares of Forest Land to the Public Works Department for… — initial checks, 2.3 km away
- Alternative Motorway for Residential Units Above the Lower Terminal Point of… — lapsed, 2.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.