Quick answers
What is this project?
Transfer of 3.3075 Hectares of Forest Land to the Public Works Department for the New Construction of Galjwadi-Santla Devi Motor Road (Including a Bridge) is a lapsed road project in Bhitarli, Dehradun, Uttarakhand. It seeks 8.2 acres of forest land.
Who is building it?
The applicant is Executive Engineer Provincial Division PWD Dehradun.
Has it been approved?
No. The application was lapsed on 17 Oct 2026, so it is no longer under consideration.
Where is it?
In Bhitarli, Dehradun, Uttarakhand.
How big is it?
It has a stated cost of ₹1.9 crore and 8.2 acres (3.3 ha) of forest land.
When was it filed?
The application was filed on 27 May 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 17 Oct 2026 |
| Application filed | 27 May 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Executive Engineer Provincial Division PWD Dehradun |
| Forest land | 8.2 acres (3.3 ha) |
| Project cost | ₹1.9 crore |
| Village / locality | Bhitarli |
| Taluk / tehsil | Dehradun |
| District | Dehradun |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-01466 |
In context
42 applications in Dehradun since January 2022 are in the same category (Roads & highways): 6 approved, 20 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 18 months from filing to approval.
27 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhitarli, Dehradun, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bharatnet Project (Bhitarli Gram Panchayat) — lapsed, 1.8 km away
- Bharatnet Project (Bhitarli Gram Panchayat) — more information requested, 1.8 km away
- Environmental Clearance for Expansion of Existing Wellness Centre (Under… — environmental approval granted, 2.2 km away
- Group Housing Project – Vivaara at Khasra No. 213, Gunial Goan, Dehradun — under environmental review, 2.7 km away
- Tarangi Doon — environmental approval granted, 2.8 km away
- Alternative Motorway for Residential Units Above the Lower Terminal Point of… — lapsed, 2.9 km away
- Alternative Motorway for Residential Units Above the Lower Terminal Point of… — forest land use approved, 3 km away
- Environmental Clearance for Operation of Existing Hotel Facility "the… — environmental approval granted, 3.1 km away
More from Executive Engineer Provincial Division PWD Dehradun in Dehradun
- Transfer of 0.4032 Hectares of Forest Land to the Public Works Department for… — initial checks
- New Construction of a Motor Road From Chhoti Chhamrauli to Domkot in the… — initial checks
- Widening of Dehradun-Mussoorie Motor Road (State Route No.01) from Km. 11.725… — initial checks
- Widening of Dehradun-Mussoorie Motor Road (State Route No.01) from Km. 11.725… — lapsed
- Four Lane Elevated Road Along Rispana River From Rispana Bridge To Nagal… — lapsed
- Four Lane Elevated Road along Bindal River from Haridwar Bypass Road (NH-72)… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.