Quick answers
What is this project?
Alternative Motorway for Residential Units Above the Lower Terminal Point of the Ropeway Project From Purukul Village in Dehradun to Mussoorie (Library Chowk) is a lapsed building project in Purkalgaon, Dehradun, Uttarakhand. The site covers 6.1 acres.
Who is building it?
The applicant is Executive Engineer Provincial Division PWD Dehradun.
Has it been approved?
No. The application was lapsed on 30 Sept 2025, so it is no longer under consideration.
Where is it?
In Purkalgaon, Dehradun, Uttarakhand.
How big is it?
It has a stated cost of ₹3 lakh; a site of 6.1 acres and 2.4 acres (1 ha) of forest land.
When was it filed?
The application was filed on 2 Sept 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Alternative Motorway for Residential Units Above the Lower Terminal Point of the Ropeway…
Project details
| Official title | Construction of Alternative Motorway for Residential Units Above the Lower Terminal Point of the Ropeway Project From Purukul Village in Dehradun to Mussoorie (Library Chowk) |
|---|---|
| Status | Lapsed |
| Status since | 30 Sept 2025 |
| Application filed | 2 Sept 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Executive Engineer Provincial Division PWD Dehradun |
| Land area | 6.1 acres (2.5 ha) |
| Forest land | 2.4 acres (1 ha) |
| Project cost | ₹3 lakh |
| Village / locality | Purkalgaon |
| Taluk / tehsil | Dehradun |
| District | Dehradun |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-01616 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 20 Sept 2023 | Forest land use approved | 644.2 acres | ₹1.5 crore |
| New project filed 2 Sept 2023 (this page) | Lapsed | 6.1 acres | ₹3 lakh |
In context
165 applications in Dehradun since January 2022 are in the same category (Buildings & townships): 107 approved, 43 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 6.1 acres, this one is larger than 82% of them.
32 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Purkalgaon, Dehradun, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Alternative Motorway for Residential Units Above the Lower Terminal Point of… — forest land use approved, 150 m away
- Tarangi Doon — environmental approval granted, 1.1 km away
- Under the State Plan, Reconstruction of the Road Towards Nature School — forest land use approved, 1.5 km away
- M/s Auradoon Resort Private Limited AT Khasra No 106, Mussoorie Road, Kuthal… — environmental approval granted, 1.9 km away
- Group Housing Project – Vivaara at Khasra No. 213, Gunial Goan, Dehradun — under environmental review, 1.9 km away
- Bharatnet Project (Bhitarli Gram Panchayat) — lapsed, 2 km away
- Bharatnet Project (Bhitarli Gram Panchayat) — more information requested, 2 km away
- Environmental Clearance for Expansion of Existing Wellness Centre (Under… — environmental approval granted, 2.3 km away
More from Executive Engineer Provincial Division PWD Dehradun in Dehradun
- Transfer of 0.4032 Hectares of Forest Land to the Public Works Department for… — initial checks
- New Construction of a Motor Road From Chhoti Chhamrauli to Domkot in the… — initial checks
- Widening of Dehradun-Mussoorie Motor Road (State Route No.01) from Km. 11.725… — initial checks
- Widening of Dehradun-Mussoorie Motor Road (State Route No.01) from Km. 11.725… — lapsed
- Four Lane Elevated Road Along Rispana River From Rispana Bridge To Nagal… — lapsed
- Four Lane Elevated Road along Bindal River from Haridwar Bypass Road (NH-72)… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.