Quick answers
What is this project?
Environmental Clearance for Proposed Rbm Mining Project by Shri Balaji Stone Crusher for the Purpose of Water Recycling is an approved mining project in Tanda Bhagmal, Hardwar, Uttarakhand. The site covers 4.7 acres.
Who is building it?
The applicant is Shri Balaji Stone Crusher.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 10 Feb 2025), as of 27 Nov 2026.
Where is it?
In Tanda Bhagmal, Hardwar, Uttarakhand.
How big is it?
It has a stated cost of ₹15 lakh and a site of 4.7 acres.
When was it filed?
The application was filed on 18 Dec 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 10 Feb 2025 |
| Application filed | 18 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Shri Balaji Stone Crusher |
| Land area | 4.7 acres (1.9 ha) |
| Project cost | ₹15 lakh |
| Village / locality | Tanda Bhagmal |
| Taluk / tehsil | Hardwar |
| District | Hardwar |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00235 |
In context
61 applications in Hardwar since January 2022 are in the same category (Mining): 28 approved, 23 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4.7 acres, this one is smaller than 77% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Tanda Bhagmal, Hardwar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Soil and RBM (Sand, Bajri, Boulders) Mining for Construction of Fish Pond — environmental approval granted, 1.7 km away
- OFC Bharatnet Project — lapsed, 2.1 km away
- Collection of Mior Minerals (Reta, Bazri, Bolder) to Existing Course of Nature… — under forest review, 3.8 km away
- Environmental Clearance for Proposed Rbm Mining Project by Shri Ganesh Stone… — environmental approval granted, 4.8 km away
- Environmental Clearance for Proposed RBM mining project by M/s Surya Stone… — environmental approval granted, 6.2 km away
- Muzaffarpur Gujra Sand, Bajri & Boulder (Water Storage Tank) Mining Project — initial checks, 6.9 km away
- Motor Road from NH74 Km 18 to Nalowala in Block Bahadarabad, District Haridwar — more information requested, 8 km away
- Sand, Bajri & Boulder Mine for the Construction of a Pond for Fish Farming… — environmental approval granted, 8.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.