What is Developing? Open the mapMap

Environmental approval grantedMining · Hardwar, Uttarakhand

Environmental Clearance for Proposed RBM mining project by M/s Surya Stone Crusher for the purpose of water recycling falls in Khasra No. 36

Environmental Clearance for Proposed RBM mining project by M/s Surya Stone Crusher for the purpose of water recycling falls in Khasra No. 36 is an approved mining project in Bhuwapur Chamrawal, Hardwar, Uttarakhand. The site covers 3.6 acres. Its stated project cost is ₹15 lakh. As of 27 Nov 2026, its status is “Environmental approval granted” (since 17 Sept 2025).

See it on the live map All projects in Hardwar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Environmental Clearance for Proposed RBM mining project by M/s Surya Stone Crusher for the purpose of water recycling falls in Khasra No. 36 is an approved mining project in Bhuwapur Chamrawal, Hardwar, Uttarakhand. The site covers 3.6 acres.

Who is building it?

The applicant is Surya Stone Crusher.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 17 Sept 2025), as of 27 Nov 2026.

Where is it?

In Bhuwapur Chamrawal, Hardwar, Uttarakhand.

How big is it?

It has a stated cost of ₹15 lakh and a site of 3.6 acres.

When was it filed?

The application was filed on 5 Aug 2025.

Project details

Official titleEnvironmental Clearance for Proposed RBM mining project by M/s Surya Stone Crusher for the purpose of water recycling falls in Khasra No. 36 in village- Muzzafarpur Gujra, Tehsil Laksar District- Haridwar, State Uttarakhand (Total Area = 1.4560 Ha.).
StatusEnvironmental approval granted
Status since17 Sept 2025
Application filed5 Aug 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantSurya Stone Crusher
Land area3.6 acres (1.5 ha)
Project cost₹15 lakh
Village / localityBhuwapur Chamrawal
Taluk / tehsilHardwar
DistrictHardwar
StateUttarakhand
Location fromSite boundary on record
Our referenceWID-UK-00789

In context

61 applications in Hardwar since January 2022 are in the same category (Mining): 28 approved, 23 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 3.6 acres, this one is smaller than 84% of them.

No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.

Where it is

Bhuwapur Chamrawal, Hardwar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.