Quick answers
What is this project?
Muzaffarpur Gujra Sand, Bajri & Boulder (Water Storage Tank) Mining Project is a proposed mining project in Tanda, Hardwar, Uttarakhand. The site covers 2 acres.
Who is building it?
The applicant is Yogesh Kumar.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Tanda, Hardwar, Uttarakhand.
How big is it?
It has a stated cost of ₹4 lakh and a site of 2 acres.
When was it filed?
The application was filed on 11 Sept 2026.
Project details
| Status | Initial checks |
|---|---|
| Status since | 28 Oct 2026 |
| Application filed | 11 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Yogesh Kumar |
| Land area | 2 acres (0.8 ha) |
| Project cost | ₹4 lakh |
| Village / locality | Tanda |
| Taluk / tehsil | Hardwar |
| District | Hardwar |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00868 |
In context
61 applications in Hardwar since January 2022 are in the same category (Mining): 28 approved, 23 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2 acres, this one is smaller than 92% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Tanda, Hardwar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental Clearance for Proposed RBM mining project by M/s Surya Stone… — environmental approval granted, 700 m away
- Sand, Bajri & Boulder Mine for the Construction of a Pond for Fish Farming… — environmental approval granted, 1.6 km away
- Sand, Bajri & Boulder Mine for the Construction of a Pond for Fish Farming Kh.… — returned to applicant, 1.6 km away
- Environmental Clearance for Proposed Rbm Mining Project by Shri Ganesh Stone… — environmental approval granted, 2.2 km away
- Extraction of Sand, Bajri, and Boulder (Construction of a Pond for Fish Farming) — environmental approval granted, 3.3 km away
- Sand, bajri and boulder Mine (Area- 0.7127 ha) by Pawan Singh Rawat — under environmental review, 6.4 km away
- Environmental Clearance for Proposed Rbm Mining Project by Shri Balaji Stone… — environmental approval granted, 6.9 km away
- Rampur Raighatі Aht Sand Bajri Boulder (RBM) Mining Project — initial checks, 6.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.