Quick answers
What is Basan Sand, Bajri & Boulder (RBM) Project?
Basan Sand, Bajri & Boulder (RBM) Project is an approved mining project in Byasi, Kalsi, Dehradun, Uttarakhand. The site covers 5 acres.
Who is building it?
The applicant is Gambhir Singh Chauhan.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 28 Sept 2025), as of 27 Nov 2026.
Where is it?
In Byasi, Kalsi, Dehradun, Uttarakhand.
How big is it?
It has a stated cost of ₹6 lakh and a site of 5 acres.
When was it filed?
The application was filed on 6 Sept 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 28 Sept 2025 |
| Application filed | 6 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Gambhir Singh Chauhan |
| Land area | 5 acres (2 ha) |
| Project cost | ₹6 lakh |
| Village / locality | Byasi |
| Taluk / tehsil | Kalsi |
| District | Dehradun |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00572 |
In context
96 applications in Dehradun since January 2022 are in the same category (Mining): 65 approved, 23 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 5 acres, this one is smaller than 62% of them.
No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.
Where it is
Byasi, Kalsi, Dehradun, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Rehabilitation and Up Gradation of Single/ Intermediate Lane to 2 Lane With… — more information requested, 2.1 km away
- Rehabilitation and Up Gradation of Single/ Intermediate Lane to 2 Lane With… — lapsed, 2.1 km away
- Bhaler- Kandoi- Madrsu M/R — lapsed, 2.3 km away
- VILLAGE- KATAPATTHAR, TEHSIL- VIKASNAGAR, DISTRICT- DEHRADUN (UTTARAKHAND),… — more information requested, 2.6 km away
- Proposed Katapatthar Sand, Bajri and Boulders Mining at Narokhala River by M/s… — environmental approval granted, 2.6 km away
- Proposed Katapatthar Sand, Bajri and Boulders Mining at Narokhala River by M/s… — cleared for impact study, 2.6 km away
- Proposed Katapatthar Sand, Bajri and Boulders Mining at Narokhala River by M/s… — withdrawn, 2.6 km away
- जनपद देहरादून के विकास खण्ड कालसी के अन्तर्गत रा0मा0 सं0 123 (507) के कि0मी0… — forest land use approved, 3.2 km away
More from Gambhir Singh Chauhan in Dehradun
- Dumet- Jalaliya RBM Mining Project — initial checks
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.