Quick answers
What is this project?
Rehabilitation and Up Gradation of Single/ Intermediate Lane to 2 Lane With Paved Shoulders From Existing Chainage (Km 11+700 to Km 40+500) Design Chainage (Km 0+000 to Km 25+660) (Badhwala to Judo Via Katapathar ) (Badhwala to Lakhwar Bend Section) on NH- 123 (New NH No. 507) Under Epc Mode in the State of Uttarakhand is a lapsed road project in An Field Tea Company, Vikas Nagar, Dehradun, Uttarakhand. The site covers 60.3 acres.
Who is building it?
The applicant is Nh-Pwd, Dehradun.
Has it been approved?
No. The application was lapsed on 11 Oct 2025, so it is no longer under consideration.
Where is it?
In An Field Tea Company, Vikas Nagar, Dehradun, Uttarakhand.
How big is it?
It has a stated cost of ₹246.2 crore; a site of 60.3 acres and 57.6 acres (23.3 ha) of forest land.
When was it filed?
The application was filed on 24 Jul 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 11 Oct 2025 |
| Application filed | 24 Jul 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Nh-Pwd, Dehradun |
| Land area | 60.3 acres (24.4 ha) |
| Forest land | 57.6 acres (23.3 ha) |
| Project cost | ₹246.2 crore |
| Village / locality | An Field Tea Company |
| Taluk / tehsil | Vikas Nagar |
| District | Dehradun |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-01036 |
In context
42 applications in Dehradun since January 2022 are in the same category (Roads & highways): 6 approved, 20 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 18 months from filing to approval. At 60.3 acres, this one is larger than 53% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
An Field Tea Company, Vikas Nagar, Dehradun, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Rehabilitation and Up Gradation of Single/ Intermediate Lane to 2 Lane With… — more information requested, 0 m away
- Bhaler- Kandoi- Madrsu M/R — lapsed, 500 m away
- Basan Sand, Bajri & Boulder (RBM) Project — environmental approval granted, 2.1 km away
- Construction of Village Luhan to Bhadraj mandir (Danda) — initial checks, 4.6 km away
- VILLAGE- KATAPATTHAR, TEHSIL- VIKASNAGAR, DISTRICT- DEHRADUN (UTTARAKHAND),… — more information requested, 4.7 km away
- Proposed Katapatthar Sand, Bajri and Boulders Mining at Narokhala River by M/s… — environmental approval granted, 4.7 km away
- Proposed Katapatthar Sand, Bajri and Boulders Mining at Narokhala River by M/s… — cleared for impact study, 4.7 km away
- Proposed Katapatthar Sand, Bajri and Boulders Mining at Narokhala River by M/s… — withdrawn, 4.7 km away
More from Nh-Pwd, Dehradun in Dehradun
- Rehabilitation and Up Gradation of Single/ Intermediate Lane to 2 Lane With… — more information requested
- जनपद देहरादून के विकास खण्ड कालसी के अन्तर्गत रा0मा0 सं0 123 (507) के कि0मी0… — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.