Quick answers
What is this project?
Rehabilitation and Up Gradation of Single/ Intermediate Lane to 2 Lane With Paved Shoulders From Existing Chainage (Km 11+700 to Km 40+500) Design Chainage (Km 0+000 to Km 25+660) (Badhwala to Judo Via Katapathar ) (Badhwala to Lakhwar Bend Section) on NH- 123 (New NH No. 507) Under Epc Mode in the State of Uttarakhand is a proposed road project in Tauli, Vikas Nagar, Dehradun, Uttarakhand. The site covers 60.3 acres.
Who is building it?
The applicant is Nh-Pwd, Dehradun.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Tauli, Vikas Nagar, Dehradun, Uttarakhand.
How big is it?
It has a stated cost of ₹246.2 crore; a site of 60.3 acres and 38.6 acres (15.6 ha) of forest land.
When was it filed?
The application was filed on 1 Jan 2026.
Project details
| Status | More information requested |
|---|---|
| Status since | 5 Nov 2026 |
| Application filed | 1 Jan 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Nh-Pwd, Dehradun |
| Land area | 60.3 acres (24.4 ha) |
| Forest land | 38.6 acres (15.6 ha) |
| Project cost | ₹246.2 crore |
| Village / locality | Tauli |
| Taluk / tehsil | Vikas Nagar |
| District | Dehradun |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-01055 |
In context
42 applications in Dehradun since January 2022 are in the same category (Roads & highways): 6 approved, 20 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 18 months from filing to approval. At 60.3 acres, this one is larger than 53% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Tauli, Vikas Nagar, Dehradun, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Rehabilitation and Up Gradation of Single/ Intermediate Lane to 2 Lane With… — lapsed, 0 m away
- Bhaler- Kandoi- Madrsu M/R — lapsed, 500 m away
- Basan Sand, Bajri & Boulder (RBM) Project — environmental approval granted, 2.1 km away
- Construction of Village Luhan to Bhadraj mandir (Danda) — initial checks, 4.6 km away
- VILLAGE- KATAPATTHAR, TEHSIL- VIKASNAGAR, DISTRICT- DEHRADUN (UTTARAKHAND),… — more information requested, 4.7 km away
- Proposed Katapatthar Sand, Bajri and Boulders Mining at Narokhala River by M/s… — environmental approval granted, 4.7 km away
- Proposed Katapatthar Sand, Bajri and Boulders Mining at Narokhala River by M/s… — cleared for impact study, 4.7 km away
- Proposed Katapatthar Sand, Bajri and Boulders Mining at Narokhala River by M/s… — withdrawn, 4.7 km away
More from Nh-Pwd, Dehradun in Dehradun
- जनपद देहरादून के विकास खण्ड कालसी के अन्तर्गत रा0मा0 सं0 123 (507) के कि0मी0… — forest land use approved
- Rehabilitation and Up Gradation of Single/ Intermediate Lane to 2 Lane With… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.