Quick answers
What is this project?
Environmental clearance for proposed expansion of existing Aluminium Coil & Sheets/Foils manufacturing unit by M/s Paragon Industries Ltd. at Plot No. 162, 164, 168, 169, 170, 171 & 172 Raipur Industrial Area, Bhagwanpur, Distt- Haridwar, Uttarakhand is an approved industrial project in Raipur, Roorkee, Hardwar, Uttarakhand. The site covers 2.9 acres.
Who is building it?
The applicant is Paragon Industries Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 21 Mar 2025), as of 27 Nov 2026.
Where is it?
In Raipur, Roorkee, Hardwar, Uttarakhand.
How big is it?
It has a stated cost of ₹338.9 crore and a site of 2.9 acres.
When was it filed?
The application was filed on 3 Mar 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 21 Mar 2025 |
| Application filed | 3 Mar 2025 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Paragon Industries Limited |
| Land area | 2.9 acres (1.2 ha) |
| Project cost | ₹338.9 crore |
| Village / locality | Raipur |
| Taluk / tehsil | Roorkee |
| District | Hardwar |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00656 |
In context
22 applications in Hardwar since January 2022 are in the same category (Industry): 17 approved, 5 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 1 months from filing to approval. At 2.9 acres, this one is smaller than 86% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Raipur, Roorkee, Hardwar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial project by M/s Vimlesh Coils & Conductors (Unit-III) Khasra Nos.… — environmental approval granted, 1 km away
- Industrial project by M/s Vimlesh Coils & Conductors (Unit-III) Khasra Nos.… — cleared for impact study, 1 km away
- Proposed Expansion in production capacity of Cement Grinding Unit from 1.2… — cleared for impact study, 3 km away
- Proposed Expansion in production capacity of Cement Grinding Unit from 1.2… — environmental approval granted, 3 km away
- Arogyam Educational Trust — environmental approval granted, 4.6 km away
- Environmental Clearance for Replacement & Expansion of existing Incinerator &… — cleared for impact study, 6.3 km away
- Environmental Clearance for Replacement & Expansion of existing Incinerator &… — environmental approval granted, 6.3 km away
- Expansion in Cement Production Capacity of Existing Stand-alone Grinding Unit… — under environmental review, 7.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.