Quick answers
What is this project?
Environmental Clearance for Replacement & Expansion of existing Incinerator & other utilities of Common Bio Medical Waste Treatment Facility (CBWTF) by M/s Medical Pollution Control Committee (MPCC) is a proposed waste management project in Chauli, Roorkee, Hardwar, Uttarakhand. The site covers 1 acre.
Who is building it?
The applicant is Medical Pollution Control Committee.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 16 Apr 2025), as of 27 Nov 2026.
Where is it?
In Chauli, Roorkee, Hardwar, Uttarakhand.
How big is it?
It has a stated cost of ₹1.5 crore and a site of 1 acre.
When was it filed?
The application was filed on 17 Mar 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Environmental Clearance for Replacement & Expansion of existing Incinerator & other…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 16 Apr 2025 |
| Application filed | 17 Mar 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Waste management |
| Applicant | Medical Pollution Control Committee |
| Land area | 1 acres (0.4 ha) |
| Project cost | ₹1.5 crore |
| Village / locality | Chauli |
| Taluk / tehsil | Roorkee |
| District | Hardwar |
| State | Uttarakhand |
| Location from | Site area on record |
| Our reference | WID-UK-00836 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 26 Aug 2025 | Environmental approval granted | 1 acre | ₹1.5 crore |
| Early planning filed 17 Mar 2025 (this page) | Cleared for impact study | 1 acre | ₹1.5 crore |
In context
6 applications in Hardwar since January 2022 are in the same category (Waste management): 5 approved, 0 filed or under review, and 1 withdrawn, lapsed or rejected.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chauli, Roorkee, Hardwar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental Clearance for Replacement & Expansion of existing Incinerator &… — environmental approval granted, 0 m away
- Proposed Expansion in production capacity of Cement Grinding Unit from 1.2… — environmental approval granted, 4 km away
- Proposed Expansion in production capacity of Cement Grinding Unit from 1.2… — cleared for impact study, 4 km away
- Industrial project by M/s Vimlesh Coils & Conductors (Unit-III) Khasra Nos.… — environmental approval granted, 6.2 km away
- Industrial project by M/s Vimlesh Coils & Conductors (Unit-III) Khasra Nos.… — cleared for impact study, 6.2 km away
- Environmental clearance for proposed expansion of existing Aluminium Coil &… — environmental approval granted, 6.3 km away
- Amendment in Existing Environmental Clearance for Change in Product Mix… — environmental approval granted, 6.6 km away
- Expansion of DG Set, Boiler Capacity and Manufacturing of Ayurvedic / Herbal… — environmental approval granted, 10 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.