What is Developing? Open the mapMap

Environmental approval grantedIndustry · Hardwar, Uttarakhand

Proposed Expansion in production capacity of Cement Grinding Unit from 1.2 MTPA to 3.0 MTPA

Proposed Expansion in production capacity of Cement Grinding Unit from 1.2 MTPA to 3.0 MTPA is an approved industrial project in Lakesari, Roorkee, Hardwar, Uttarakhand. The site covers 49.6 acres. Its stated project cost is ₹456.9 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 26 Oct 2025).

See it on the live map All projects in Hardwar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Expansion in production capacity of Cement Grinding Unit from 1.2 MTPA to 3.0 MTPA is an approved industrial project in Lakesari, Roorkee, Hardwar, Uttarakhand. The site covers 49.6 acres.

Who is building it?

The applicant is Ambuja Cement Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 26 Oct 2025), as of 27 Nov 2026.

Where is it?

In Lakesari, Roorkee, Hardwar, Uttarakhand.

How big is it?

It has a stated cost of ₹456.9 crore and a site of 49.6 acres.

When was it filed?

The application was filed on 12 Sept 2025.

Project details

Official titleProposed Expansion in production capacity of Cement Grinding Unit from 1.2 MTPA to 3.0 MTPA at located near Village: Lakeshwari, P.O- Sikanderpur Bhainswal, Bhagwanpur, Roorkee, Distt. Haridwar, Uttarakhand, Pin- 247661 by M/s Ambuja Cements Limited (Unit: Roorkee)
StatusEnvironmental approval granted
Status since26 Oct 2025
Application filed12 Sept 2025
Approval soughtEnvironmental approval
Application typeExpansion
SectorIndustry
ApplicantAmbuja Cement Limited
Land area49.6 acres (20.1 ha)
Project cost₹456.9 crore
Village / localityLakesari
Taluk / tehsilRoorkee
DistrictHardwar
StateUttarakhand
Location fromSite boundary on record
Our referenceWID-UK-00710

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 12 Sept 2025 (this page)Environmental approval granted49.6 acres₹456.9 crore
Early planning filed 18 Jan 2024Cleared for impact study49.6 acres₹456.9 crore

In context

22 applications in Hardwar since January 2022 are in the same category (Industry): 17 approved, 5 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 1 months from filing to approval. At 49.6 acres, this one is larger than 82% of them.

5 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Lakesari, Roorkee, Hardwar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 26 Ambuja Cement projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.