Quick answers
What is this project?
25 MW Captive Co-generation Power Plant at Sitarganj, District Udham Singh Nagar, Uttarakhand by M/s Gujarat Ambuja Exports Limited is a proposed power project in Lalar Patti, Sitarganj, Udham Singh Nagar, Uttarakhand. The site covers 7.4 acres.
Who is building it?
The applicant is Gujarat Ambuja Exports LTD.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Lalar Patti, Sitarganj, Udham Singh Nagar, Uttarakhand.
How big is it?
It has a stated cost of ₹150 crore and a site of 7.4 acres.
When was it filed?
The application was filed on 4 Aug 2026.
Project details
| Status | More information requested |
|---|---|
| Status since | 13 Nov 2026 |
| Application filed | 4 Aug 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Power |
| Applicant | Gujarat Ambuja Exports LTD |
| Land area | 7.4 acres (3 ha) |
| Project cost | ₹150 crore |
| Village / locality | Lalar Patti |
| Taluk / tehsil | Sitarganj |
| District | Udham Singh Nagar |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00846 |
In context
33 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Lalar Patti, Sitarganj, Udham Singh Nagar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental Clearance for Proposed Expansion of Existing Water Based… — environmental approval granted, 600 m away
- Affordable housing project under violation by M/s Grip Construction Pvt. Ltd. — environmental approval granted, 700 m away
- Affordable housing project under violation by M/s Grip Construction Pvt. Ltd. — cleared for impact study, 700 m away
- Proposed 20 TPD Hazardous Waste Incinerator Facility (Standalone incinerator)… — cleared for impact study, 900 m away
- Ukrauli Sand, Bajri and Boulders (RBM) Mining in Kailash River at Khasra No.… — initial checks, 900 m away
- Ukrauli Sand, Bajri and Boulders (RBM) Mining in Kailash River at Khasra No.… — environmental approval granted, 900 m away
- Ukrauli Sand, Bajri and Boulders (RBM) Mining in Kailash River at Khasra No.… — cleared for impact study, 900 m away
- Sand, Bajri and Boulders Mining in Kailash River located at Khasra No.67मि०,… — returned to applicant, 950 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.