Quick answers
What is this project?
Proposed 20 TPD Hazardous Waste Incinerator Facility (Standalone incinerator) at Plot No. A-04, Phase-I, ELDECO SIDCUL Industrial Park, Sitarganj, District Udham Singh Nagar, Uttarakhand is a proposed waste management project in Lalar Patti, Sitarganj, Udham Singh Nagar, Uttarakhand. The site covers 1.5 acres.
Who is building it?
The applicant is Greenland Waste Management.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 26 May 2026), as of 27 Nov 2026.
Where is it?
In Lalar Patti, Sitarganj, Udham Singh Nagar, Uttarakhand.
How big is it?
It has a stated cost of ₹5.8 crore and a site of 1.5 acres.
When was it filed?
The application was filed on 15 Apr 2026.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 26 May 2026 |
| Application filed | 15 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Waste management |
| Applicant | Greenland Waste Management |
| Land area | 1.5 acres (0.6 ha) |
| Project cost | ₹5.8 crore |
| Village / locality | Lalar Patti |
| Taluk / tehsil | Sitarganj |
| District | Udham Singh Nagar |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00848 |
In context
6 applications in Udham Singh Nagar since January 2022 are in the same category (Waste management): 3 approved, 2 filed or under review, and 1 withdrawn, lapsed or rejected.
33 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Lalar Patti, Sitarganj, Udham Singh Nagar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental Clearance for Proposed Expansion of Existing Water Based… — environmental approval granted, 550 m away
- Environmental Clearance for Production of Resin Derivatives in Existing… — environmental approval granted, 600 m away
- Environmental Clearance for Production of Resin Derivatives in Existing… — withdrawn, 600 m away
- 25 MW Captive Co-generation Power Plant at Sitarganj, District Udham Singh… — more information requested, 900 m away
- Affordable housing project under violation by M/s Grip Construction Pvt. Ltd. — environmental approval granted, 1.6 km away
- Affordable housing project under violation by M/s Grip Construction Pvt. Ltd. — cleared for impact study, 1.6 km away
- Ukrauli Sand, Bajri and Boulders (RBM) Mining in Kailash River at Khasra No.… — initial checks, 1.8 km away
- Ukrauli Sand, Bajri and Boulders (RBM) Mining in Kailash River at Khasra No.… — environmental approval granted, 1.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.