Environmental Clearance for Proposed Expansion of Existing Water Based Polymers Emulsion Manufacturing Unit by M/S Speciality Industrial Polymers & Coatings PVT. LTD is an approved industrial project in Lalar Patti, Sitarganj, Udham Singh Nagar, Uttarakhand. The site covers 1.1 acres.
Who is building it?
The applicant is Speciality Industrial Polymers and Coatings Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 26 Nov 2024), as of 27 Nov 2026.
Where is it?
In Lalar Patti, Sitarganj, Udham Singh Nagar, Uttarakhand.
How big is it?
It has a stated cost of ₹6.8 crore and a site of 1.1 acres.
When was it filed?
The application was filed on 9 Oct 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 26 Nov 2024 |
| Application filed | 9 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Speciality Industrial Polymers and Coatings Private Limited |
| Land area | 1.1 acres (0.4 ha) |
| Project cost | ₹6.8 crore |
| Village / locality | Lalar Patti |
| Taluk / tehsil | Sitarganj |
| District | Udham Singh Nagar |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00517 |
In context
50 applications in Udham Singh Nagar since January 2022 are in the same category (Industry): 39 approved, 4 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 44 days from filing to approval. At 1.1 acres, this one is smaller than 86% of them.
33 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Lalar Patti, Sitarganj, Udham Singh Nagar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed 20 TPD Hazardous Waste Incinerator Facility (Standalone incinerator)… — cleared for impact study, 550 m away
- 25 MW Captive Co-generation Power Plant at Sitarganj, District Udham Singh… — more information requested, 600 m away
- Environmental Clearance for Production of Resin Derivatives in Existing… — environmental approval granted, 750 m away
- Environmental Clearance for Production of Resin Derivatives in Existing… — withdrawn, 750 m away
- Affordable housing project under violation by M/s Grip Construction Pvt. Ltd. — environmental approval granted, 1.2 km away
- Affordable housing project under violation by M/s Grip Construction Pvt. Ltd. — cleared for impact study, 1.2 km away
- Ukrauli Sand, Bajri and Boulders (RBM) Mining in Kailash River at Khasra No.… — initial checks, 1.5 km away
- Ukrauli Sand, Bajri and Boulders (RBM) Mining in Kailash River at Khasra No.… — environmental approval granted, 1.5 km away
All 3 Speciality Industrial Polymers projects across India