Quick answers
What is Arakot Tiuni Hydroelectric Project (81MW)?
Arakot Tiuni Hydroelectric Project (81MW) is a proposed water and irrigation project in Banpur, Tyuni, Dehradun, Uttarakhand. The site covers 408.4 acres.
Who is building it?
The applicant is Ujvn Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Banpur, Tyuni, Dehradun, Uttarakhand.
How big is it?
It has a stated cost of ₹12.1 crore and a site of 408.4 acres.
When was it filed?
The application was filed on 23 Jun 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 18 Aug 2026 |
| Application filed | 23 Jun 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Water & irrigation |
| Applicant | Ujvn Limited |
| Land area | 408.4 acres (165.3 ha) |
| Project cost | ₹12.1 crore |
| Village / locality | Banpur |
| Taluk / tehsil | Tyuni |
| District | Dehradun |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00900 |
In context
16 applications in Dehradun since January 2022 are in the same category (Water & irrigation): 5 approved, 6 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 2.8 years from filing to approval. At 408.4 acres, this one is larger than 92% of them.
Where it is
Banpur, Tyuni, Dehradun, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Tiuni Plasu HEP (72 MW) — forest land use approved, 6.6 km away
- Construciton of pedestrian brige over Tons River near Bhankwar Khudd in Block… — initial checks, 8.2 km away
- Widening of NH 72B (707) Km. 133.150 to 173.600 (Portion Km 0/00 to 165.00)… — lapsed, 9.1 km away
- Pyunal Water Supply Scheme — lapsed, 9.9 km away
- Dhamich Motor Road From Village Purtad Darmigad to Dhamich Kheda of Village… — initial checks, 10.9 km away
- Dungri Penuwa Water Supply Scheme — more information requested, 19.9 km away
- Ofc Bharat Net Project — under forest review, 26.8 km away
- Lavadi (Gadsar) Water Supply Scheme — more information requested, 29.8 km away
More from Ujvn Limited in Dehradun
- Tiuni Plasu HEP (72 MW) — forest land use approved
All 9 Ujvn projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.