Quick answers
What is this project?
Construciton of pedestrian brige over Tons River near Bhankwar Khudd in Block Mori, District Uttarkashi Under State Sector is a proposed road project in Bawar R F, Tyuni, Dehradun, Uttarakhand. The site covers 0 acres.
Who is building it?
The applicant is Pwd.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Bawar R F, Tyuni, Dehradun, Uttarakhand.
How big is it?
It has a stated cost of ₹4.1 crore; a site of 0 acres and 120 m² of forest land.
When was it filed?
The application was filed on 18 Sept 2026.
Project details
| Status | Initial checks |
|---|---|
| Status since | 18 Sept 2026 |
| Application filed | 18 Sept 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Pwd |
| Land area | 100 m² |
| Forest land | 120 m² |
| Project cost | ₹4.1 crore |
| Village / locality | Bawar R F |
| Taluk / tehsil | Tyuni |
| District | Dehradun |
| State | Uttarakhand |
| Location from | Site area on record |
| Our reference | WID-UK-01039 |
In context
42 applications in Dehradun since January 2022 are in the same category (Roads & highways): 6 approved, 20 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 18 months from filing to approval. At 0 acres, this one is smaller than 100% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bawar R F, Tyuni, Dehradun, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Dhamich Motor Road From Village Purtad Darmigad to Dhamich Kheda of Village… — initial checks, 4.5 km away
- Tiuni Plasu HEP (72 MW) — forest land use approved, 6.2 km away
- Arakot Tiuni Hydroelectric Project (81MW) — under environmental review, 8.2 km away
- Widening of NH 72B (707) Km. 133.150 to 173.600 (Portion Km 0/00 to 165.00)… — lapsed, 9.9 km away
- Pyunal Water Supply Scheme — lapsed, 14.3 km away
- Dungri Penuwa Water Supply Scheme — more information requested, 14.6 km away
- Lavadi (Gadsar) Water Supply Scheme — more information requested, 22.2 km away
- Lavadi Goh Water Supply Scheme — lapsed, 22.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.