Quick answers
What is this project?
Improvement / Upgradation to 4/6 lane Moradabad-Kashipur section of NH 734 including Moradabad Bypass under NHDP Phase-VII in the state of Uttar Pradesh. Package 3: Kashipur Bypass (Total Length 13.51 km) by NHAI is an approved road project in Betwala, Jaspur, Udham Singh Nagar, Uttarakhand. The site covers 250.1 acres.
Who is building it?
The applicant is National Highways Authority of India (NHAI).
Has it been approved?
Yes. Its status is “Forest land use approved” (since 14 Sept 2026), as of 27 Nov 2026.
Where is it?
In Betwala, Jaspur, Udham Singh Nagar, Uttarakhand.
How big is it?
It has a stated cost of ₹936 crore; a site of 250.1 acres and 1.7 acres (0.7 ha) of forest land.
When was it filed?
The application was filed on 27 Jul 2023.
Project details
| Official title | Improvement / Upgradation to 4/6 lane Moradabad-Kashipur section of NH 734 including Moradabad Bypass under NHDP Phase-VII in the state of Uttar Pradesh. Package 3: Kashipur Bypass (Total Length 13.51 km) in Udham Singh Nagar district of Uttarakhand State (Design Ch 39+750 to Ch 53+260) |
|---|---|
| Status | Forest land use approved |
| Status since | 14 Sept 2026 |
| Application filed | 27 Jul 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | National Highways Authority of India (NHAI) |
| Land area | 250.1 acres (101.2 ha) |
| Forest land | 1.7 acres (0.7 ha) |
| Project cost | ₹936 crore |
| Village / locality | Betwala |
| Taluk / tehsil | Jaspur |
| District | Udham Singh Nagar |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00960 |
In context
6 applications in Udham Singh Nagar since January 2022 are in the same category (Roads & highways): 2 approved, 4 filed or under review, and 0 withdrawn, lapsed or rejected.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Betwala, Jaspur, Udham Singh Nagar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Kachnalgaji Sand/Silt, Bajri & Boulder (River Bed Material) Deposit at Dhela… — environmental approval granted, 950 m away
- Proposed Expansion of Existing Paper Mill (paper manufacturing from waste… — cleared for impact study, 2.8 km away
- Silt/Sand, Bajri & Boulder (RBM) Mining in Dhela River Khasra No. 52/5, 154/2,… — environmental approval granted, 3.4 km away
- Silt/Sand, Bajri & Boulder (RBM) Mining in Dhela River at Khasra No. 1347/5,… — environmental approval granted, 4 km away
- Production Capacity Enhancement of Existing Paper Machine [pm3] (Manufacturing… — initial checks, 6.2 km away
- Amalgamation & Expansion of Multiply Board/Coated Paper Machine (Pm3) From 400… — lapsed, 6.2 km away
- Regularization of existing Rolling mill plant for production of 237,600 TPA… — environmental approval granted, 7.9 km away
- Regularization of existing Rolling mill plant for production of 237,600 TPA… — cleared for impact study, 7.9 km away
3 National Highways Authority of India (NHAI) projects in Udham Singh Nagar
All 548 National Highways Authority of India (NHAI) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.