Quick answers
What is this project?
Proposed Expansion of Existing Paper Mill (paper manufacturing from waste paper & virgin pulp) from 5000 MT/Month to 6650 MT/month [240 MT/day] with inclusion of deinking, bleaching operation in the whole project". by Katyani Paper Mills Pvt. Ltd. Located at Vill- Kuddiyawala, Near Sodhi Farm Jaspur - Kashipur Road, Kashipur, Dist.- Udham Singh Nagar, Uttarakhand is a proposed industrial project in Kudaiyanwala, Jaspur, Udham Singh Nagar, Uttarakhand. The site covers 8.3 acres.
Who is building it?
The applicant is Katyayini Paper Mills Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 20 Sept 2024), as of 27 Nov 2026.
Where is it?
In Kudaiyanwala, Jaspur, Udham Singh Nagar, Uttarakhand.
How big is it?
It has a stated cost of ₹125 crore and a site of 8.3 acres.
When was it filed?
The application was filed on 23 Aug 2024.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 20 Sept 2024 |
| Application filed | 23 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Katyayini Paper Mills Private Limited |
| Land area | 8.3 acres (3.4 ha) |
| Project cost | ₹125 crore |
| Village / locality | Kudaiyanwala |
| Taluk / tehsil | Jaspur |
| District | Udham Singh Nagar |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00547 |
In context
50 applications in Udham Singh Nagar since January 2022 are in the same category (Industry): 39 approved, 4 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 44 days from filing to approval. At 8.3 acres, this one is smaller than 52% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kudaiyanwala, Jaspur, Udham Singh Nagar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Improvement / Upgradation to 4/6 lane Moradabad-Kashipur section of NH 734… — forest land use approved, 2.8 km away
- Silt/Sand, Bajri & Boulder (RBM) Mining in Dhela River Khasra No. 52/5, 154/2,… — environmental approval granted, 2.8 km away
- Silt/Sand, Bajri & Boulder (RBM) Mining in Dhela River at Khasra No. 1347/5,… — environmental approval granted, 2.8 km away
- Production Capacity Enhancement of Existing Paper Machine [pm3] (Manufacturing… — initial checks, 3.4 km away
- Amalgamation & Expansion of Multiply Board/Coated Paper Machine (Pm3) From 400… — lapsed, 3.4 km away
- Kachnalgaji Sand/Silt, Bajri & Boulder (River Bed Material) Deposit at Dhela… — environmental approval granted, 3.6 km away
- Enhancement of MS Ingots/Billets production from 2,04,000 TPA to 3,74,000 TPA… — environmental approval granted, 8.6 km away
- Enhancement of MS Ingots/Billets production from 2,04,000 TPA to 3,74,000 TPA… — cleared for impact study, 8.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.