Quick answers
What is this project?
New Construction of a Motor Road From Chhoti Chhamrauli to Domkot in the Mussoorie Assembly Constituency of Dehradun District is a proposed road project in Bhainswara, Dehradun, Uttarakhand. The site covers 215.3 acres.
Who is building it?
The applicant is Executive Engineer Provincial Division PWD Dehradun.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Bhainswara, Dehradun, Uttarakhand.
How big is it?
It has a stated cost of ₹6,000 crore; a site of 215.3 acres and 6.3 acres (2.6 ha) of forest land.
When was it filed?
The application was filed on 3 Sept 2026.
Project details
| Official title | New Construction of a Motor Road From Chhoti Chhamrauli to Domkot in the Mussoorie Assembly Constituency of Dehradun District, Under the Hon'ble Chief Minister's Announcement No. 1586/2021. |
|---|---|
| Status | Initial checks |
| Status since | 3 Sept 2026 |
| Application filed | 3 Sept 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Executive Engineer Provincial Division PWD Dehradun |
| Land area | 215.3 acres (87.1 ha) |
| Forest land | 6.3 acres (2.6 ha) |
| Project cost | ₹6,000 crore |
| Village / locality | Bhainswara |
| Taluk / tehsil | Dehradun |
| District | Dehradun |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-01224 |
In context
42 applications in Dehradun since January 2022 are in the same category (Roads & highways): 6 approved, 20 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 18 months from filing to approval. At 215.3 acres, this one is larger than 71% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhainswara, Dehradun, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Vardhman Enterprises — lapsed, 2.4 km away
- USO 4G PROJECT -Mobile Tower Construction/Installation by BSNL — more information requested, 3.5 km away
- New 4g Mobile Tower Installation by Bharat Sanchar Nigam LTD Dehradun — lapsed, 3.5 km away
- Environmental Clearance for expansion in existing Group Housing "Pacific Golf… — lapsed, 5.7 km away
- 60m span Bridge and approach road of Maldevta- Dwara Motor Road for Raipur Block — forest land use approved, 6 km away
- Link Road from Masrana near of KM 179 of NH 707A to Motidhar in Distt. Dehradun — lapsed, 6.3 km away
- Kyara-Dhanaulti Motor Road, in Mussoorie Constituency, Distt. Dehradun — under forest review, 6.5 km away
- Proposed Sand, Bajri and Boulders Mining in Baldi River" At Khasra no. 166,… — environmental approval granted, 6.7 km away
More from Executive Engineer Provincial Division PWD Dehradun in Dehradun
- Transfer of 0.4032 Hectares of Forest Land to the Public Works Department for… — initial checks
- Widening of Dehradun-Mussoorie Motor Road (State Route No.01) from Km. 11.725… — initial checks
- Widening of Dehradun-Mussoorie Motor Road (State Route No.01) from Km. 11.725… — lapsed
- Four Lane Elevated Road Along Rispana River From Rispana Bridge To Nagal… — lapsed
- Four Lane Elevated Road along Bindal River from Haridwar Bypass Road (NH-72)… — lapsed
- Four Lane Elevated Road along Bindal River from Haridwar Bypass Road (NH-72)… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.