Widening of Dehradun-Mussoorie Motor Road (State Route No.01) from Km. 11.725 (Diversion Chowk) to Km. 17.00 Kuthal Gate in Assembl Mussorie under State Plan.

Widening of Dehradun-Mussoorie Motor Road (State Route No.01) from Km. 11.725 (Diversion Chowk) to Km. 17.00 Kuthal Gate in Assembl Mussorie under State Plan is a lapsed road project in Malsi, Dehradun, Uttarakhand. It seeks 9.1 acres of forest land. Its stated project cost is ₹44 lakh. As of 27 Nov 2026, its status is “Lapsed” (since 13 Jun 2026).

See it on the live map All projects in Dehradun

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Widening of Dehradun-Mussoorie Motor Road (State Route No.01) from Km. 11.725 (Diversion Chowk) to Km. 17.00 Kuthal Gate in Assembl Mussorie under State Plan is a lapsed road project in Malsi, Dehradun, Uttarakhand. It seeks 9.1 acres of forest land.

Who is building it?

The applicant is Executive Engineer Provincial Division PWD Dehradun.

Has it been approved?

No. The application was lapsed on 13 Jun 2026, so it is no longer under consideration.

Where is it?

In Malsi, Dehradun, Uttarakhand.

How big is it?

It has a stated cost of ₹44 lakh and 9.1 acres (3.7 ha) of forest land.

When was it filed?

The application was filed on 7 Apr 2026.

Project details

StatusLapsed
Status since13 Jun 2026
Application filed7 Apr 2026
Approval soughtForest land use
Application typeNew project
SectorRoads & highways
ApplicantExecutive Engineer Provincial Division PWD Dehradun
Forest land9.1 acres (3.7 ha)
Project cost₹44 lakh
Village / localityMalsi
Taluk / tehsilDehradun
DistrictDehradun
StateUttarakhand
Location fromSite boundary on record
Our referenceWID-UK-01561

In context

42 applications in Dehradun since January 2022 are in the same category (Roads & highways): 6 approved, 20 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 18 months from filing to approval.

32 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Malsi, Dehradun, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Executive Engineer Provincial Division PWD Dehradun in Dehradun

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.