What is Developing? Open the mapMap

LapsedRoads & highways · Dehradun, Uttarakhand

Four Lane Elevated Road Along Rispana River From Rispana Bridge To Nagal Bridge in the state of Uttarakhand (Total design length = 10.468 km)

Four Lane Elevated Road Along Rispana River From Rispana Bridge To Nagal Bridge in the state of Uttarakhand (Total design length = 10.468 km) is a lapsed road project in Dhorankhas, Dehradun, Uttarakhand. The site covers 5.2 acres. Its stated project cost is ₹2,092.4 crore. As of 27 Nov 2026, its status is “Lapsed” (since 31 Oct 2025).

See it on the live map All projects in Dehradun

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Four Lane Elevated Road Along Rispana River From Rispana Bridge To Nagal Bridge in the state of Uttarakhand (Total design length = 10.468 km) is a lapsed road project in Dhorankhas, Dehradun, Uttarakhand. The site covers 5.2 acres.

Who is building it?

The applicant is Executive Engineer Provincial Division PWD Dehradun.

Has it been approved?

No. The application was lapsed on 31 Oct 2025, so it is no longer under consideration.

Where is it?

In Dhorankhas, Dehradun, Uttarakhand.

How big is it?

It has a stated cost of ₹2,092.4 crore; a site of 5.2 acres and 4.7 acres (1.9 ha) of forest land.

When was it filed?

The application was filed on 18 Aug 2025.

Project details

Official titleConstruction Of Four Lane Elevated Road Along Rispana River From Rispana Bridge To Nagal Bridge in the state of Uttarakhand (Total design length = 10.468 km)
StatusLapsed
Status since31 Oct 2025
Application filed18 Aug 2025
Approval soughtForest land use
Application typeNew project
SectorRoads & highways
ApplicantExecutive Engineer Provincial Division PWD Dehradun
Land area5.2 acres (2.1 ha)
Forest land4.7 acres (1.9 ha)
Project cost₹2,092.4 crore
Village / localityDhorankhas
Taluk / tehsilDehradun
DistrictDehradun
StateUttarakhand
Location fromSite boundary on record
Our referenceWID-UK-01706

In context

42 applications in Dehradun since January 2022 are in the same category (Roads & highways): 6 approved, 20 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 18 months from filing to approval. At 5.2 acres, this one is smaller than 82% of them.

32 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Dhorankhas, Dehradun, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Executive Engineer Provincial Division PWD Dehradun in Dehradun

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.