Quick answers
What is this project?
High Speed Access Controlled Corridor from Shamli - Gorakhpur (Phase-1) in the state of Uttar Pradesh (Package 1B) is a proposed road project in Gidhawali Khurd, Laksar, Hardwar, Uttarakhand. The site covers 18,541.4 acres.
Who is building it?
The applicant is National Highway Authority of India.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Gidhawali Khurd, Laksar, Hardwar, Uttarakhand.
How big is it?
It has a stated cost of ₹39.8 crore; a site of 18,541.4 acres and 16.8 acres (6.8 ha) of forest land.
When was it filed?
The application was filed on 15 Sept 2026.
Project details
| Official title | Development of High Speed Access Controlled Corridor from Shamli - Gorakhpur (Phase-1) in the state of Uttar Pradesh (Package 1B) |
|---|---|
| Status | More information requested |
| Status since | 24 Oct 2026 |
| Application filed | 15 Sept 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | National Highway Authority of India |
| Land area | 18,541.4 acres (7,503.5 ha) |
| Forest land | 16.8 acres (6.8 ha) |
| Project cost | ₹39.8 crore |
| Village / locality | Gidhawali Khurd |
| Taluk / tehsil | Laksar |
| District | Hardwar |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-02022 |
In context
10 applications in Hardwar since January 2022 are in the same category (Roads & highways): 2 approved, 8 filed or under review, and 0 withdrawn, lapsed or rejected.
Where it is
Gidhawali Khurd, Laksar, Hardwar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Rampur Raighatі Aht Sand Bajri Boulder (RBM) Mining Project — initial checks, 102.6 km away
- Sand, bajri and boulder Mine (Area- 0.7127 ha) by Pawan Singh Rawat — under environmental review, 103.5 km away
- Extraction of Sand, Bajri, and Boulder (Construction of a Pond for Fish Farming) — environmental approval granted, 107.5 km away
- Sand, Bajri & Boulder Mine for the Construction of a Pond for Fish Farming… — environmental approval granted, 108 km away
- Sand, Bajri & Boulder Mine for the Construction of a Pond for Fish Farming Kh.… — returned to applicant, 108 km away
- Wildlife Clearance, Collection of Sand, Bajri and Boulder in the Area From a… — under wildlife review, 108.1 km away
- Motor Road from NH74 Km 18 to Nalowala in Block Bahadarabad, District Haridwar — more information requested, 108.4 km away
- 225 M Span Suspension Bridge Over Rawasan River Joining Rasoolpur Arynagar to… — forest land use approved, 108.9 km away
More from National Highway Authority of India in Hardwar
- Diversion of Forest land for Road Safety Improvement of Critical junction on… — forest land use approved
7 National Highways Authority of India (NHAI) projects in Hardwar
All 548 National Highways Authority of India (NHAI) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.