Quick answers
What is this project?
Extraction of Sand, Bajri, and Boulder (Construction of a Pond for Fish Farming) is an approved mining project in Barampur, Laksar, Hardwar, Uttarakhand. The site covers 8.4 acres.
Who is building it?
The applicant is Babali.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 23 May 2025), as of 27 Nov 2026.
Where is it?
In Barampur, Laksar, Hardwar, Uttarakhand.
How big is it?
It has a stated cost of ₹70 lakh and a site of 8.4 acres.
When was it filed?
The application was filed on 21 Apr 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 23 May 2025 |
| Application filed | 21 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Babali |
| Land area | 8.4 acres (3.4 ha) |
| Project cost | ₹70 lakh |
| Village / locality | Barampur |
| Taluk / tehsil | Laksar |
| District | Hardwar |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00684 |
In context
61 applications in Hardwar since January 2022 are in the same category (Mining): 28 approved, 23 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 8.4 acres, this one is larger than 77% of them.
No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.
Where it is
Barampur, Laksar, Hardwar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand, Bajri & Boulder Mine for the Construction of a Pond for Fish Farming… — environmental approval granted, 2.1 km away
- Sand, Bajri & Boulder Mine for the Construction of a Pond for Fish Farming Kh.… — returned to applicant, 2.1 km away
- Muzaffarpur Gujra Sand, Bajri & Boulder (Water Storage Tank) Mining Project — initial checks, 3.3 km away
- Environmental Clearance for Proposed RBM mining project by M/s Surya Stone… — environmental approval granted, 4 km away
- Environmental Clearance for Proposed Rbm Mining Project by Shri Ganesh Stone… — environmental approval granted, 5.4 km away
- Rampur Raighatі Aht Sand Bajri Boulder (RBM) Mining Project — initial checks, 5.6 km away
- Sand, bajri and boulder Mine (Area- 0.7127 ha) by Pawan Singh Rawat — under environmental review, 6 km away
- Proposed 60 KLPD Grain Based Distillery — environmental approval granted, 8.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.