Quick answers
What is this project?
Sand, bajri and boulder Mine (Area- 0.7127 ha) by Pawan Singh Rawat is a proposed mining project in Rampur Raighati, Laksar, Hardwar, Uttarakhand. The site covers 1.8 acres.
Who is building it?
The applicant is Pawan Singh Rawat.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Rampur Raighati, Laksar, Hardwar, Uttarakhand.
How big is it?
It has a stated cost of ₹48 lakh and a site of 1.8 acres.
When was it filed?
The application was filed on 8 Oct 2026.
Project details
| Official title | Sand, bajri and boulder Mine (Area- 0.7127 ha) at Village Rampur Raighati Ahatmal, Tehsil Laksar, District Haridwar in the Uttarakhand State by Pawan Singh Rawat. |
|---|---|
| Status | Under environmental review |
| Status since | 30 Oct 2026 |
| Application filed | 8 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Pawan Singh Rawat |
| Land area | 1.8 acres (0.7 ha) |
| Project cost | ₹48 lakh |
| Village / locality | Rampur Raighati |
| Taluk / tehsil | Laksar |
| District | Hardwar |
| State | Uttarakhand |
| Location from | Site boundary on record |
| Our reference | WID-UK-00883 |
In context
61 applications in Hardwar since January 2022 are in the same category (Mining): 28 approved, 23 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1.8 acres, this one is smaller than 95% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Rampur Raighati, Laksar, Hardwar, Uttarakhand. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Rampur Raighatі Aht Sand Bajri Boulder (RBM) Mining Project — initial checks, 1.9 km away
- Sand, Bajri & Boulder Mine for the Construction of a Pond for Fish Farming… — environmental approval granted, 5.2 km away
- Sand, Bajri & Boulder Mine for the Construction of a Pond for Fish Farming Kh.… — returned to applicant, 5.2 km away
- Extraction of Sand, Bajri, and Boulder (Construction of a Pond for Fish Farming) — environmental approval granted, 6 km away
- Muzaffarpur Gujra Sand, Bajri & Boulder (Water Storage Tank) Mining Project — initial checks, 6.4 km away
- Environmental Clearance for Proposed RBM mining project by M/s Surya Stone… — environmental approval granted, 6.5 km away
- Environmental Clearance for Proposed Rbm Mining Project by Shri Ganesh Stone… — environmental approval granted, 6.7 km away
- Environmental Clearance for Proposed Rbm Mining Project by Shri Balaji Stone… — environmental approval granted, 10.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.