Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 28 Sept 2022 |
| Application filed | 28 Sept 2022 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Dipanshu Dhaka |
| Land area | 3 acres (1.2 ha) |
| Project cost | ₹3 lakh |
| Village / locality | Shah Alipur Gudar |
| Taluk / tehsil | Nagina |
| District | Bulandshahr |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00002 |
In context
8 applications in Bulandshahr since January 2022 are in the same category (Mining): 4 approved, 3 filed or under review, and 1 withdrawn, lapsed or rejected.
No other mining lease on record has applied within 5 km of this site.
Where it is
Shah Alipur Gudar, Nagina, Bulandshahr, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Retail Outlet M/SHSD Retai Outlet of BPCL Meerut LTD. Protected Land is… — lapsed, 38.2 km away
- Improvement of Existing SH-65 From Km 0+000 to Km 49+624 — lapsed, 112.6 km away
- Proposed expansion of existing Sugar unit from 4500 TCD to 10000 TCD — environmental approval granted, 125.4 km away
- Proposed expansion of existing Sugar unit from 4500 TCD to 10000 TCD — cleared for impact study, 125.4 km away
- Dfcc Edd-1 Bulandshahar — more information requested, 129.4 km away
- Project for Laying of Carbon Steel Gas Pipeline by Indian Oil-Adani Gas… — lapsed, 133.3 km away
- Project for Forest Clearence:- लोक निर्माण विभाग ,प्रांतीय डिवीजन ,बुलंदशहर… — lapsed, 133.8 km away
- Common Bio Medical Waste Treatment Facility — under environmental review, 134 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.