Quick answers
What is this project?
Building Stone, Khanda, Boulder, Blastt (Gitti), [granite] & Hilly Red Morrum Mining Project is an approved mining project in Makarbai, Mahoba, Uttar Pradesh. The site covers 1.4 acres.
Who is building it?
The applicant is Daljeet Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 20 Jan 2023), as of 27 Nov 2026.
Where is it?
In Makarbai, Mahoba, Uttar Pradesh.
How big is it?
It has a stated cost of ₹98 lakh and a site of 1.4 acres.
When was it filed?
The application was filed on 20 Jan 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 20 Jan 2023 |
| Application filed | 20 Jan 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Daljeet Singh |
| Land area | 1.4 acres (0.6 ha) |
| Project cost | ₹98 lakh |
| Village / locality | Makarbai |
| Taluk / tehsil | Mahoba |
| District | Mahoba |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00003 |
In context
310 applications in Mahoba since January 2022 are in the same category (Mining): 251 approved, 27 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.4 acres, this one is smaller than 91% of them.
3 other mining leases have applied within 500 m of this site; together with this one they cover 11.4 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 17 mining leases have applied within 5 km.
Where it is
Makarbai, Mahoba, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Mining… — environmental approval granted, 250 m away
- Proposed "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Mining… — cleared for impact study, 250 m away
- Building Stone (Granite Khanda, Boulder, Bailast (Gitti)) — environmental approval granted, 350 m away
- Building Stone (Granite Khanda, Boulder, Bailast (Gitti)) — cleared for impact study, 350 m away
- Area 1.619 Ha Building Stone-Khanda, Boulder, Ballast (Gitti) Mining Project… — environmental approval granted, 400 m away
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata… — cleared for impact study, 700 m away
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata… — environmental approval granted, 700 m away
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata… — environmental approval granted, 900 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.