Quick answers
What is this project?
Area 1.619 Ha Building Stone-Khanda, Boulder, Ballast (Gitti) Mining Project At Araji No. 1985 Kha, Village- Makarbai, Tehsil-Sadar, District-Mahoba, Uttar Pradesh is an approved mining project in Makarbai, Mahoba, Uttar Pradesh. The site covers 4 acres.
Who is building it?
The applicant is S.R. Trading.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 16 Nov 2023), as of 27 Nov 2026.
Where is it?
In Makarbai, Mahoba, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.7 crore and a site of 4 acres.
When was it filed?
The application was filed on 16 Nov 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 16 Nov 2023 |
| Application filed | 16 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | S.R. Trading |
| Land area | 4 acres (1.6 ha) |
| Project cost | ₹1.7 crore |
| Village / locality | Makarbai |
| Taluk / tehsil | Mahoba |
| District | Mahoba |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00224 |
In context
310 applications in Mahoba since January 2022 are in the same category (Mining): 251 approved, 27 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 4 acres, this one is larger than 64% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 5.4 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 18 mining leases have applied within 5 km.
Where it is
Makarbai, Mahoba, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Building Stone, Khanda, Boulder, Blastt (Gitti), [granite] & Hilly Red Morrum… — environmental approval granted, 400 m away
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata… — environmental approval granted, 600 m away
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata… — cleared for impact study, 600 m away
- "Building Stone (Khanda, Boulder, Bailast (Gitti)) & Pahari Red Morram"… — environmental approval granted, 600 m away
- Proposed "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Mining… — environmental approval granted, 600 m away
- Proposed "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Mining… — cleared for impact study, 600 m away
- Building Stone (Granite Khanda, Boulder, Bailast (Gitti)) — environmental approval granted, 700 m away
- Building Stone (Granite Khanda, Boulder, Bailast (Gitti)) — cleared for impact study, 700 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.