Quick answers
What is this project?
Proposed "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Mining Project is an approved mining project in Pahra, Mahoba, Uttar Pradesh. The site covers 3 acres.
Who is building it?
The applicant is Neeraj Kumar.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 27 Jun 2023), as of 27 Nov 2026.
Where is it?
In Pahra, Mahoba, Uttar Pradesh.
How big is it?
It has a stated cost of ₹68 lakh and a site of 3 acres.
When was it filed?
The application was filed on 27 Jun 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 27 Jun 2023 |
| Application filed | 27 Jun 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Neeraj Kumar |
| Land area | 3 acres (1.2 ha) |
| Project cost | ₹68 lakh |
| Village / locality | Pahra |
| Taluk / tehsil | Mahoba |
| District | Mahoba |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01043 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 27 Jun 2023 (this page) | Environmental approval granted | 3 acres | ₹68 lakh |
| Early planning filed 29 Nov 2022 | Cleared for impact study | 3 acres | ₹68 lakh |
In context
310 applications in Mahoba since January 2022 are in the same category (Mining): 251 approved, 27 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 3 acres, this one is smaller than 59% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 7.4 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 18 mining leases have applied within 5 km.
Where it is
Pahra, Mahoba, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Mining… — cleared for impact study, 0 m away
- Building Stone (Granite Khanda, Boulder, Bailast (Gitti)) — environmental approval granted, 100 m away
- Building Stone (Granite Khanda, Boulder, Bailast (Gitti)) — cleared for impact study, 100 m away
- Building Stone, Khanda, Boulder, Blastt (Gitti), [granite] & Hilly Red Morrum… — environmental approval granted, 250 m away
- Area 1.619 Ha Building Stone-Khanda, Boulder, Ballast (Gitti) Mining Project… — environmental approval granted, 600 m away
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata… — cleared for impact study, 650 m away
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata… — environmental approval granted, 700 m away
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata… — environmental approval granted, 850 m away