Environmental approval grantedMining · Mahoba, Uttar Pradesh

Proposed "Building Stone (Khanda, Boulder, Bailast (Gitti)) & Pahari Red Morram" Project

Proposed "Building Stone (Khanda, Boulder, Bailast (Gitti)) & Pahari Red Morram" Project is an approved mining project in Pahra, 0, Mahoba, Uttar Pradesh. The site covers 3.8 acres. Its stated project cost is ₹76 lakh. As of 27 Nov 2026, its status is “Environmental approval granted” (since 19 Nov 2022).

See it on the live map All projects in Mahoba

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed "Building Stone (Khanda, Boulder, Bailast (Gitti)) & Pahari Red Morram" Project is an approved mining project in Pahra, 0, Mahoba, Uttar Pradesh. The site covers 3.8 acres.

Who is building it?

The applicant is Ritu Singh.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 19 Nov 2022), as of 27 Nov 2026.

Where is it?

In Pahra, 0, Mahoba, Uttar Pradesh.

How big is it?

It has a stated cost of ₹76 lakh and a site of 3.8 acres.

When was it filed?

The application was filed on 19 Nov 2022.

Project details

StatusEnvironmental approval granted
Status since19 Nov 2022
Application filed19 Nov 2022
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantRitu Singh
Land area3.8 acres (1.5 ha)
Project cost₹76 lakh
Village / localityPahra
Taluk / tehsil0
DistrictMahoba
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-00010

In context

310 applications in Mahoba since January 2022 are in the same category (Mining): 251 approved, 27 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 3.8 acres, this one is larger than 64% of them.

3 other mining leases have applied within 500 m of this site; together with this one they cover 18 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 18 mining leases have applied within 5 km.

Where it is

Pahra, 0, Mahoba, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.