Quick answers
What is this project?
Proposed "Granite And Dolostone Ballast Gitti" Project at Gata No.-2702 Khand 3 New, Village- Pahra, Tehsil- Mahoba, District- Mahoba, U.P. (Applied Area- 2.0240 ha.), Shri Sangram Singh S/o Shri Jaiwant Singh is a proposed mining project in Pahra, Mahoba, Uttar Pradesh. The site covers 5 acres.
Who is building it?
The applicant is Sangram Singh.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 28 Sept 2026), as of 27 Nov 2026.
Where is it?
In Pahra, Mahoba, Uttar Pradesh.
How big is it?
It has a stated cost of ₹64 lakh and a site of 5 acres.
When was it filed?
The application was filed on 29 Jul 2026.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 28 Sept 2026 |
| Application filed | 29 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Sangram Singh |
| Land area | 5 acres (2 ha) |
| Project cost | ₹64 lakh |
| Village / locality | Pahra |
| Taluk / tehsil | Mahoba |
| District | Mahoba |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05022 |
In context
310 applications in Mahoba since January 2022 are in the same category (Mining): 251 approved, 27 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 5 acres, this one is larger than 73% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 13.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 18 mining leases have applied within 5 km.
Where it is
Pahra, Mahoba, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Building stone as Granite (Khanda, Boulder, and Gitty) mining at Gata… — cleared for impact study, 150 m away
- Proposed "Building Stone (Khanda, Boulder, Bailast (Gitti)) & Pahari Red… — environmental approval granted, 150 m away
- "Building Stone (Khanda, Boulder, Bailast (Gitti)) & Pahari Red Morram"… — environmental approval granted, 550 m away
- "Building Stone (Khanda, Gitti, Boulders)" Project at Gata No.- 2702 Khand No.… — cleared for impact study, 650 m away
- Project, of "Building Stone as Khanda, Boulders, Ballast (Gitti) Mining… — environmental approval granted, 1000 m away
- Project, of "Building Stone as Khanda, Boulders, Ballast (Gitti) Mining… — cleared for impact study, 1000 m away
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata… — environmental approval granted, 1.1 km away
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata… — cleared for impact study, 1.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.