What is Developing? Open the mapMap

Cleared for impact studyMining · Mahoba, Uttar Pradesh

"Building Stone (Khanda, Gitti, Boulders)" Project at Gata No.- 2702 Khand No. 02 (New), Village- Pahra, Tehsil- Mahoba, District- Mahoba, U.P. (Leased Area : 2.0240 ha.), Shri Om Prakash Khatri S/o Shri Tulsidas Khatri

"Building Stone (Khanda, Gitti, Boulders)" Project at Gata No.- 2702 Khand No. 02 (New), Village- Pahra, Tehsil- Mahoba, District- Mahoba, U.P. (Leased Area : 2.0240 ha.), Shri Om Prakash Khatri S/o Shri Tulsidas Khatri is a proposed mining project in Pahra, Mahoba, Uttar Pradesh. The site covers 5 acres. Its stated project cost is ₹71 lakh. As of 27 Nov 2026, its status is “Cleared for impact study” (since 29 May 2026).

See it on the live map All projects in Mahoba

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

"Building Stone (Khanda, Gitti, Boulders)" Project at Gata No.- 2702 Khand No. 02 (New), Village- Pahra, Tehsil- Mahoba, District- Mahoba, U.P. (Leased Area : 2.0240 ha.), Shri Om Prakash Khatri S/o Shri Tulsidas Khatri is a proposed mining project in Pahra, Mahoba, Uttar Pradesh. The site covers 5 acres.

Who is building it?

The applicant is Om Prakash Khatri.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 29 May 2026), as of 27 Nov 2026.

Where is it?

In Pahra, Mahoba, Uttar Pradesh.

How big is it?

It has a stated cost of ₹71 lakh and a site of 5 acres.

When was it filed?

The application was filed on 29 Mar 2025.

Project details

StatusCleared for impact study
Status since29 May 2026
Application filed29 Mar 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantOm Prakash Khatri
Land area5 acres (2 ha)
Project cost₹71 lakh
Village / localityPahra
Taluk / tehsilMahoba
DistrictMahoba
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-03170

In context

310 applications in Mahoba since January 2022 are in the same category (Mining): 251 approved, 27 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 5 acres, this one is larger than 73% of them.

No other mining lease on record is within 500 m of this site; 18 have applied within 5 km.

Where it is

Pahra, Mahoba, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.