Sanfran Sarovar Heights Multistoried Residential Building at Arazi No.-134, 135, 136, 137, 98 & 97/2 Lahargird, Jhansi, Uttar Pradesh is an approved building project in Lahar Gird, Jhansi, Uttar Pradesh. The site covers 3.5 acres.
Who is building it?
The applicant is Sanfran Developer Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 9 Feb 2024), as of 27 Nov 2026.
Where is it?
In Lahar Gird, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹113 crore and a site of 3.5 acres.
When was it filed?
The application was filed on 9 Feb 2024.
Project details
| Official title | Proposed Construction of Sanfran Sarovar Heights Multistoried Residential Building at Arazi No.-134, 135, 136, 137, 98 & 97/2 Lahargird, Jhansi, Uttar Pradesh |
|---|---|
| Status | Environmental approval granted |
| Status since | 9 Feb 2024 |
| Application filed | 9 Feb 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Sanfran Developer Private Limited |
| Land area | 3.5 acres (1.4 ha) |
| Project cost | ₹113 crore |
| Village / locality | Lahar Gird |
| Taluk / tehsil | Jhansi |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00030 |
In context
7 applications in Jhansi since January 2022 are in the same category (Buildings & townships): 4 approved, 2 filed or under review, and 1 withdrawn, lapsed or rejected.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Lahar Gird, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Building Stone or Khanda, Gitti, Boulder, Mining Project — more information requested, 1.5 km away
- Building Stone or Granite, Khanda, Boulder (Gitty) Mining Project — lapsed, 1.7 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to IOCL… — forest land use approved, 2.7 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — lapsed, 3.9 km away
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — more information requested, 4.5 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to… — forest land use approved, 6 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to… — under forest review, 6.2 km away
- Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail… — more information requested, 7.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.