Quick answers
What is this project?
Building Stone or Granite, Khanda, Boulder (Gitty) Mining Project is a lapsed mining project in Pali Pahari, Jhansi, Uttar Pradesh. The site covers 3 acres.
Who is building it?
The applicant is Deepak Yadav.
Has it been approved?
No. The application was lapsed on 18 Oct 2025, so it is no longer under consideration.
Where is it?
In Pali Pahari, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹81 lakh and a site of 3 acres.
When was it filed?
The application was filed on 16 Jun 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 18 Oct 2025 |
| Application filed | 16 Jun 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Deepak Yadav |
| Land area | 3 acres (1.2 ha) |
| Project cost | ₹81 lakh |
| Village / locality | Pali Pahari |
| Taluk / tehsil | Jhansi |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02704 |
In context
211 applications in Jhansi since January 2022 are in the same category (Mining): 146 approved, 39 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 3 acres, this one is smaller than 86% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 1 mining lease has applied within 5 km.
Where it is
Pali Pahari, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Building Stone or Khanda, Gitti, Boulder, Mining Project — more information requested, 150 m away
- Proposed protected forest land to be diverted for Entry/Exit approach to IOCL… — forest land use approved, 1.4 km away
- Sanfran Sarovar Heights Multistoried Residential Building at Arazi No.-134,… — environmental approval granted, 1.7 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — lapsed, 2.6 km away
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — more information requested, 3.3 km away
- Proposed 4" Ø Steel (600 class,API5LX42,6.4mm wall thickness) Gas pipeline by… — lapsed, 6.6 km away
- Diversion of Protected forest land for non-forest purpose for construction of… — lapsed, 6.8 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to… — forest land use approved, 7.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.